Loading…
Loading…
3,969 results • Recent activity
Inside Repair and painting works to the Ground floor of two storied D M Bungalow South 24 Prgs during the year 2025-26
Patch repairing work of Uluberia- Bagnan Road from 0.00 km to 0.50 km at various stretches including concreting beside river bank area in the District of Howrah under Howrah Division PWD, during the year 2025-26.
Preparation of DPR for firefighting system with arrangement network at existing G 1 storied College Building G 1 storied Lecture Hall etc within the campus of Ramakrishana Mission Shilpapitha Belgharia Kolkata 700056 during the year 2025 26
Patch repairing work of Nimdighi- Basudevpur Road from 0.00 km to 2.00 km with Link Road at various stretches in the District of Howrah under Howrah Division PWD, during the year 2025-26.
Relocation of damaged drainage system due to land development work at vacate land of proposed new Court Complex of Uluberia Sub Divisional Court at Puleswar under Howrah Division, PWD, during the year 2025-26.
Repair and painting driver room with some Sanitary and Plumbing work and small length boundary wall at the beside of fire pump room in the campus of Multi storied building, Alipore, Kolkata-700027 during the year 2025-2026.