Loading…
Loading…
3,969 results • Recent activity
Roof treatment work by laying APP at the Roof of D M Bungalow , South 24 Pargs.(in patches at 2nd floor ) during the year 2024-25
Repair and Restoration of Diamond Harbour Road from ch 7_095 km to 9_730 km in different stretches due to road cutting by CESC KMC etc during the year 2025_26
Repair and renovation works to the bathrooms of the two storied D M Bungalow South 24 Prgs during the year 2025-26
Partial modification Blood Centre at the premises of Santipur S.G Hospital, Santipur Nadia-- EI work and SITC of AC Machine
Inside Repair and painting works to the 1st floor of two storied D M Bungalow South 24 Prgs during the year 2025-26.
Restoration of damage surface of road due to open trench cutting done by KMDA for pit excavation at different stretches for laying of 500mm dia SWMS pipe by H D D technique at Jessore Road from Barat Bus stop to Satgachi More Both Bound Carriageway