Loading…
Loading…
11 results • Latest
Linking of BG track between Yeshwanthpur and Baiyyappanahalli A panel including Yeshwanthpur, Lottegollahalli, Hebbal and Banaswadi Yards and misc. works in Bangalore Division of South Western Railway
Supply of Ballast, Manufacturing, Supply and stacking of machine crushed Track Ballast confirming to RDSO Specification from KM. 173/784 to KM. 182/338 in Anekal Road (Excl. ) Heelalige (Excl.) section in Bangalore Division of SWR
Track Linking for Baiyyappanahalli Hosur Doubling Project
Construction of 2nos of Road over bridge (ROB) and 1nos Road Under bridge (RUB) along with construction of service road and drainages in Lieu of Level crossings (LC) along the Corridor-4 Heelalige to Rajanukunte
Construction of 2 nos of Road over bridge (ROB) along with construction of service road and drainages in Lieu of Level crossings (LC) along the Corridor-4 Heelalige to Rajanukunte
Design and Construction of Formation In Embankments /Cuttings, Blanketing, MIBs, RUBs, MJBs, ERS/Retaining Wall, Drains, Boundary Wall, Fencing Works In At-Grade Section of Length 6.259 Km, Elevated viaduct of length 3.681 km and Other works