Loading…
Loading…
47 live19 closing this weekmost from Rail Wheel Plant, Bela and Indian Railways
47 results • Latest
Circular Sheathedwith Flexible Conductor (V2) ISIMarked To IS694 (Q2)
"Re-certification of GreenCo rating System at RWP, Bela for 03 (three) years".
1.Supply Erection Commissioning of Temperature Display Processor instrument-- 2. Supply Erection Commissioning of PC based data Logger with suitable software and communication network from all Infra-Red Pyrometer System----
Painting of steel structure and Building of RWP/Bela for protection against erosion and weather and to comply against Factory Act-1948.
Providing fixing turbo ventilator, poly carbonate sheet and solar pipe light at top of roof of plant for improvement of the working space at RWP/Bela.
Restoration and rejuvenation of Pond 1, 2 in main plant and Pond no.3 in staff colony (near KVS) at RWP/Bela