REQUIREMENT OF SPARES FOR CARRIER MAKE 30HXC190A WATER COOLED SCREW CHILLER UNIT (02 UNIT, CAP 185 TR EACH) FOR CENTRAL A.C SYSTEM OF UNIT 1 AND 2 AT KATPP, RVUNL, JHALAWAR
Req. of heating elements for ESP hopper Shaft and support insulator installed in ESP Unit 1 to 7 at KSTPS, Kota.
SUPPLY OF MS PLATE EQUIVALENT SAIL HARD PLATE/TISCRAL HARD PLATE/UTTAM HARD PLATE/JSPL HARD PLATE FOR BOILER CIRCLE OF KATPP JHALAWAR
Fabrication, Erection and Installation of structural steel trash rack across the Chambal river in intake channel of CW pump house, Unit-1 to 5, KSTPS, Kota
Annual Contract for Uprooting of wild vegetation (grass bushes, minor jungle, trees, etc) and cutting /trimming of trees from the various locations inside the KSTPS plant.
Supply, Installation, Testing and commissioning of Chlorine Leak Detection and Absorption PLC system installed at SSTPS , Suratgarh
Supply of spares of Wall Blowers and Shoot Blowers installed in Boiler, Unit 7 and 8 at SSCTPS, Suratgarh
Supply of air pre filter for AHU of CAC system and ECP system for unit-1 to 7 of KSTPS, Kota.
Refurbishment / Reconditioning work of Premium make Scoop coupling Type and Size PST-500 for Conveyor 2B at coal handling plant KSTPS Kota.
Supply of Gaskets at KSTPS, Kota.
Annual Contract for running of Plant canteen at CTPP, RVUN, Chhabra
Work contract for Reconditioning / Refurbishment of Hydraulic Power Cylinders and Service supervisory with complete overhauling of Hydraulic system for Roller Coal Mills ZGM133G-I of KaTPP, Jhalawar
Hiring of 12 Nos. Diesel/Petrol Hatchback Cars (i.e. TATA Indica /Vista or equivalent) with AC of 2024 or latest model with taxi permit without POL but including breakdown, repair and mtc. etc. with driver for 12 hrs. duty at STPS
Annual contract for routine, breakdown, capital maintenance work of Pre-Treatment plant, DM plant, LP Piping, Boiler /Chemical Dosing Skids, CW Treatment, SSF plant, Chlorination plant and Up keep of the area of Phase-I and II, U#1to4, 4X250MW CTPP
Supply , Installation and Commissioning of Radar Level Transmitters for Unit 2 to 6 of STPS, Suratgarh
Work of Replacement of HP Heater 5 of Unit5 of KSTPS, Kota
Annual Comprehensive O and M Contract of entire Ash handling system including silos and ESP of Unit 1 to 6 (6X250 MW), STPS, RVUN, Suratgarh
Construction of boundary wall around available 35 Bigha Land near Urja Nagar Township at GLPL, Barmer
Maintenance of horticulture works at plant site area including trees and plants
Annual contract for Jungle Clearance, Levelling and Dressing of Plant Area
For Replacement, Repairing, Capital Overhauling, Refurbishment, Retrofitting with Operation and Maintenance of various mini, micro hydel power stations situated on IGNP
TENDER INQUIRY FOR REPLACEMENT, REPAIRING, CAPITAL OVERHAULING, REFURBISHMENT, RETROFITTING WITH OPERATION AND MAINTENANCE OF 3X2 MW MANGROL HYDEL PROJECT, SITUATED AT RIGHT MAIN CANAL OF KOTA BARRAGE
PURCHASE OF ESP CARDS FOR EPIC-III CONTROLLER PANELS OF UNIT 1 AND 2 AT KATPP, RVUNL, JHALAWAR.
Supply of Pendants and Remote Control System for Cranes and Hoists and ETC Work of EOT Crane Remote Control System for CA, AHP and TG Area EOT Cranes installed at Elect. Main Plant at CSCTPP, Chhabra
Annual work contract for the work of replacement / repairing of damaged APH sector plate and its static seal plate and Fabrication of Inboard Seal Plate for air Preheater of 2x600MW Units KaTPP, Jhalawar
Work of Remote controlled mechanized high pressure hydro jet cleaning of condenser tubes up to 1000bar of 660MW unit 7 and 8 of STPS-SC, Suratgar
Removal, Supply and Application of Thermal Insulation of HP and IP Turbine, Control and Stop valves, Overload valves, Cross-over pipes etc. of Unit 7, 660 MW, SSCTPS, RVUN, Suratgarh
SUPPLY OF FABRICATED BOTTOM ASH GUARD PLATE (SS-304) at 2X600 MW, KaTPP, RVUNL, JHALAWAR
Transportation of chlorine /hydrogen cylinders and chemicals, collection and testing of various sample of unit 1 to 7 and other locations and other miscellaneous works of chemical division, KSTPS, Kota
Annual contract of Repairing and Reconditioning of different make Valves in Boiler and Turbine Area in Unit 1 and 2 KaTPP Jhalawar
Supply of various type Gear Boxes with drive (Screw conveyor Gearbox, Coal Feeder Gearbox, Clean out Conveyor (COC) Gear box) for Boiler of 2x600MW KaTPP, RVUNL Jhalawar
DIFFERENT TYPES OF ROLLERS/PULLEYS and SCREW CONVEYOR OF CMR SYSTEM
Supply of Proximity switch and Heavy Duty Side mount bracket of Unit#1to 4,CTPP, Chhabra
SUPPLY OF BOILER LOOSE TUBES AND BENDS FOR BOILER AT KATPP, JHALAWAR
SUPPLY OF PA FANS BLADES AT 2X600 MW, KaTPP, RVUNL, JHALAWAR
Supply of Spares of PA, FD and ID fans for Boiler
Design, manufacturing and supply of different size of fabricated expanded metal screens (SS) for implementing erosion control scheme along with CAVT (cold air velocity test)
Supply of Male and Female sliders/tube spacers for PLSH and FSH and Bracket stopper for LTSH coils for Boiler pressure part of unit 1 and 2 KaTPP, RVUNL, Jhalawar
Annual Works of Radiography and Ultrasonic Flow Detection of High Pressure Welding Joints in Boiler and Turbine Area of (2x660 MW), SSCTPS, RVUN, Suratgarh
Household Refrigerating Appliances as per IS 17550 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Annual Contract for the work of hydro jet cleaning of Boiler Furnace of Unit 7 and 8, SSCTPS, RVUN, Suratgarh
Annual contract for the Work of In-situ repair of various valves in Boiler and Turbine Area, 2x660 MW, SSCTPS, RVUN, Suratgarh
Repair and Maintenance of 220 kV Switchyard, Power Transformers, Rectifier Transformers and Electronic Controllers of ESP of Unit-1 to 7 , KSTPS, Kota
Procurement of Spares for M/s L and T Construction and Equipment Limited (Hydraulic Division) make equipments at CHP, CSCTPP, Chhabra
Detailed survey of the KSTPS plant premises, Kota
Steel Almirah/Cabinets conforming to IS 3312 (V4) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6842583 Dated : 31-10-2025 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Annual contract for the work of Repair and Rewinding of 3 Phase 415V LT motors except CHP of unit 7 and 8 SSCTPS Suratgarh
Procurement of spares for Boll and Kirch make Duplex Oil Filter installed in Unit 3 and 4 of CTPP Chhabra
Repairing of HP Turbine rotor and Turbine bearing No. 1 of 250 MW CTPP, Chhabra
Annual Contract for Routine, Breakdown and Capital maintenance of Ball Tube Mills, Seal Air System and Air ducts, Furnace burner panel, P.F. piping and feeder of Unit 1 to 4 of CTPP, Chhabra