Loading
Loading…
Loading…
25 results • Recent activity
Painting work of Prarpet wall and Cleaning of top drain RD 370 m. to 1320 m. Left Flank of Rajghat Dam.
Jungle clearance from RD 1235.00m to 2527.00m Upstream Slope and Down Stream Slope of Right Earthen Dam Rajghat
Jungle clearance from RD 600.00m to 3450.00m Toe Drain to Inspection Road and Inspection Road Right Side at Down Stream of Left Earthen Dam Rajghat
Jungle clearance and Earthwork cleaning of out fall drain and Relaying Outfall Drain damaged stone pitching in patches from RD 2.050 KM. (0 to 360M) At right Earthen Flank Rajghat Dam
Construction of 02 Nos Main Gate of Left flank Rajghat Dam Rajghat
Construction of 03 Nos Main Gate of Right flank Rajghat Dam Rajghat