Loading…
Loading…
77 results • Recent activity
Earth cutting and leveling Dressing of Road Drain Illegal mining pit etc as and when required for the period of one year under GM Unit Rajrappa Area
transportation of MIO Powder from UCIL, Jadugora to Rajrappa Washery Project including loading at UCIL, Jadugora and Manual Unloading at at Rajrappa Washery Project after weighment at Rajrappa Area Weighbridge for a period of 6 months
Providing of view point at sec. II (New patch) under Rajrappa Project
A) Supply of Vertical/Horizontal GOAB switch operating mechanism 11 KV grade, 800 A B) Installation of GOAB switch with required iron materials C) Installation of the GOAB switch on existing pole D) Overhauling E)Installation of Xformer in Township
diversion of existing HT Overhead Line of 6.6KV of feeder No.22 going to Koihara village for extending OB dump at Sec II (new patch) of Rajrappa Project.
Diversion of HT Overhead line of 6.6KV grade of feeder NO.-22 AT Sec-II New patch of Rajrappa Project