Loading…
Loading…
77 results • Recent activity
carriage of Spillaged coal from Apron Feeder Floor Floor of Primary Crusher Secondary Crusher Floor n surrounding area of Raw Coal site office of Raw Coal Section by manual labour including loading unloading stacking to belt chutes suitable place
cleaning accumulated coal dust from the floor and shed of the Transformers Electrical Room as well as the surrounding area of PS 3 and the Electrical HT room and workshop The work will be carried out by manual labor which includes loading unloadi
Providing Stone pitching on banks of Settling pond at the end of Wharf wall and 12 C pond and providing RCC drain from loading point to wharfall end under RWP Rajarappa Area
cleaning of grass and weeds, including uprooting of rank vegetation, etc, on an as and when required basis, along overhead lines and at and around the field and main substation of Rajrappa Project.
providing, fabrication, erection and alignment of hand railing of stairs by welding and providing M.S.Tube and also its brackets support in different place of Rajrappa Washery
cleaning of jungle/ bush from Surrounding area of Reject Stocks n Slurry Stocks for the preparation of annual coal stock measurement by CIL Team 2024 25 at Rajrappa Washery Project