Loading…
Loading…
Found 81 active tenders
81 results • Latest
SF of Biomass system With 2 year operation Construction of 01 nos Mini Boring with 02HP submersible pump internal electrification of biomass Cold Room 20 MT Capacity and Operation work and cabling etc work at Sahibabad Ghaziabad
Wiring point for light with 1.5 sq. mm.FRLSH PVC insulated multistrand single core copper conductor cable in heavy guage rigid steel conduit pipe on surface, complete with 14 SWG copper earth continuity wire,GP Box ,piano type switch and ceiling rose/angle/ batten holder on 3 mm. thick phenolic laminated backelite sheet etc. complete in all respect, as directed .
Const. of Link Road Gram shekhpura to gram salhapur to nakur sarsawa naveen sampark marg
Earth work in cutting in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levies and slopes and also including 1.50 M lift and 30 M. Lead The earth from cutting S.I. No. 253 a
AMILA DARGAH MARG SE ALLUPUR NAHAR TAK MARMMAT/NAVINIKARN KAY. (05 VERSHIYA ANURAKSHAN SAHIT)
Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer- in-charee.
KANTH TARAV PWD ROAD SE JHATAHARA ANU BASTI TAK MARMMAT/NAVINIKARN KAY. (05 VERSHIYA ANURAKSHAN SAHIT)
Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer- in-charee.
PATJIVA INTER COLLEGE SE RAMASHANKAR PANDEY KE DARVAJE SE PURAB TARAF SE SHAKKARPUR ANU. BASTI HOTE HUY NETUA TOLA TAK MARMMAT/NAVINIKARN KAY. (05 VERSHIYA ANURAKSHAN SAHIT)
Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer- in-charee.
AZAMGARH-CHIRAIYAKOT-GAZIPUR MARG SESIRASA ANU. BASTI TAK MARMMAT/NAVINIKARN KAY. (05 VERSHIYA ANURAKSHAN SAHIT)
Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer- in-charee.