Loading…
Loading…
168 results • Latest
Sampark marg pwd pachdeuri sadak se nandana marg tak marramat karya
PART A WBM G-3 - Providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405
Reparing of link Road Shalehpur Chaurahe se PWD Barihahawa marg tak
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. SI No 253
Reparin Link Road PWD barihawa marg se Unchaera tak
Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer-in-charee.
Repair and Maintenance of Link Road Chapar Sadara Road to Kasampur
Earth work in cutting in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levies and slopes and also including 1.50 M lift and 30 M. Lead The earth from cutting S.I. No. 253 a
Repair and Maintenance of Link Road Bilaspur byeepass Road per Devi Mandir to jola Road
Earth work in cutting in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levies and slopes and also including 1.50 M lift and 30 M. Lead The earth from cutting S.I. No. 253 a
Reparing of link road Ramjanki marg par Ambedkar Gram Bantwaar Ka Awashesh Bhaag
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. SI No 253