Loading…
Loading…
630 results • Latest
R/M of Link Road Dhudhiya Khurd road se Naugawan Mujaffarnagar tak under Mandi Samiti Puranpur Length-2.10Km
R/M of Link Road Amriya road se Bagwan tak under Mandi Samiti Pilibhit Length-3.00 Km
R/M of Link Road Allapur Rupmai- Gyoti Marg se Nagriya Hardaspur hote hue Gyoti dharampur Tak Under Mandi Samiti Budaun Length-2.30 km
R/M of Link Road Bilsi Sirasol marg se Bagarpur SagarpurTak Under Mandi Samiti Bilsi Length-2.14 km
GANJEHADI BHANDAR MARG PAR KAMAPUR SE ISRAULI MARG TAK
KUREBHAR HALIYAPUR MARG SE BRAMAULI TAK MARMMAT KARYA
FAIZABAD RASTIYA RAJMARG RUDAULI MANDI KE PASS SE GULCHAPPA KHURD TAK
Repairing of link road braur ka ngla ahladi ki madaiya
Repaing of link road hanspur to murlipur
Repairing of link road Banipara road to devkipurwa
Repairing of link road Dilwal to baheda via bhandemau
Repairing of link road gajner road to gram jaswapur road to turra
Repairing of link road Nahar to bhadaripur Omprakash pandey house
Repairing of link road bamripur ekraurapur marg to gram marhna
Repairing of link road Gram Visdhan ke majra ema ke nharpur ke pas tio bilaripur
Repairing of link road bilhaur rasulabad marg to kakwan to kureh road to atwa
Repairing of link road Medva
Repairing of link road G.T Road to Sevamandir school to nath
Repair and painting work of the existing Secretary office and meeting hall at NMY Meerut
Work involving the repair of damaged internal drains at the new flower and fruit vegetable market and installation of interlocking tiles in vacant areas of the market premises and construction of a CC road alongside the toilets laying of a drinkin
Repair and painting work for the office buildings of the Deputy Director (Administration and Marketing) and Deputy Director (Construction), the boundary wall, and the toilets/bathrooms within the office buildings and rooms
Maintenance and Repairing of Link Road Para To Kandor Under Mandi Samiti Kurara
Maintenance and Repairing of Link Road Mamna To Sutarpur under Mandi Samiti Rath
Maintenance and Repairing of Link Road Jalla Mahera Road To Mau under Mandi Samiti Muskura
Construction of Weigh Bridge Room Size 3.00mX 3.00m at S.M.Y. Raya (Mathura)
Construction of Link Road Mallpur Bhandsar Marg To Gram Myudi Rani Tak Under Mandi Samiti Bareilly
Construction of Way Bridge room in NMY Madhogarh
Repairing of link road Khushalpura bamba ki patri via ngla jharu
Repairing of link road nevilgang bhadurpur road to nagla vidhi
Construction of Way Bridge Room in NMY Ait
Repairing of link road rastrey marg to sultnapura
Repairing of link road modadev to nagla prashad
Repair and reconstruction and painting of damaged boundary walls at various locations within the new Mandi premises at NMY Debai
Repair and maintenance work of the link road Sakalpur main road se namini gav hote huye bhisampur main road tak.
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Mamrezpur Mandi Samiti Purwan.
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Bahuda Kalan Mandi Samiti Bachharawan
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Bhadayal Mandi Samiti Hardoi.
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Bhupkhera Mandi Samiti Purwan.
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Zorawarganj Mandi Samiti Purwan.
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Bhadeswa Mandi Samiti Banthara.
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Budhanpur Mandi Samiti Raibareli.
S/I/T/C of Solar Street Light and S/I/T/C of 2.0 KW Capacity Rooftof Solar Plant, Construction of Tube Well and S/F of 1.0 HP capacity Submersible Pump Set at at Hatpath Dulampur Mandi Samiti Raibareli.
Internal Electrification in C Type Shop 10 Nos. and S/F of LED Street Light etc. works at NMY Kamalganj (Farrurkhabad).
Internal Electrification in C Type Shop 25 Nos. and S/F of LED Street Light etc. works at NMY Mohammadabad (Farrurkhabad).
Internal Electrification in A Type Shop 10 Nos, B Type Shop 10 Nos and C Type Shop 15 Nos. and Extension of L.T.Distribution Line and supply/fixing of LED Street Light etc. works etc. works at NMY Chhibaramau (Kannauj).
Annual Comprehensive Maintenance and Operation of 680 Ton Central Air Conditioner Plant System installed at Kisan Mandi Bhawan Gomti Nagar Lko.
Supply Installation Comissioning Testing of 01 No 16 mtr High Mast light SF of flood light and Cabling etc work at NMY Varanasi
Repair of link road Hardoi neer road to kataiya. (L-1.10 Km)
Construction of C.C. Road,Repairing and Maintanance of Internal Road By Hot Mix Plant,Repairing and maintenance of 0.45x.45 mtr R.C.C. Drain, Repairing and maintenance of Sachiv Office at NMY Bangarmau, District-Unnao.
Repairing of link road Patna pul to yakubpur marg par aneso pul to ludhaura