Loading…
Loading…
1,628 results • Latest
Butterfly Valve
Handling and Transport on Lumpsum Basis - Transport Service, Handling and Transport on Lumpsum Basis - Handling Service
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; ANNUAL RATE CONTRACT FOR SKILLED AND UNSKILLED MANPOWER FOR ETP UPGRADATION PROJECT AND VARIOUS INSTRUMENTATION JOBS, AT ETP, IN RCF THAL, ON OPEN TENDER ..
Ammonia Evaporator
Multi colored Urea HDPE bags for Packing Sulphur coated Urea (Bag Capacity- 40 Kg)
Facility Management Services - LumpSum Based - Industrial; Hiring of two fixed Drivers along with upkeep and maintenance of Company car; Consumables to be provided by service provider (inclusive in contract cost)
Handling and Transport on Lumpsum Basis - E3032 Loading Unloading and Shifting of Equipment in Suphala Plant at RCF Trombay Unit
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; E 949 Replacement of Reactors & shifting, installation of tank in suphala plant at RCF, Trombay unit; As per SOW
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; E 4128 Supervisory services of G E Oil and Gas India Pvt Ltd for assisting in overhauling, maintenance and troubleshooting jobs on Synthesis Gas Comp..
REFER BIDDING DOCUMENT
SWITCH MODE POWER SUPPLY, OUTPUT: 24 VDC/5 A, SWITCH MODE POWER SUPPLY, OUTPUT: 24 VDC/10 A, SWITCH MODE POWER SUPPLY, OUTPUT: 24 VDC/20 A
ARC FOR SUPPLY OF MEDICAL GRADE GASES
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 376-AS PER SCOPE OF WORK MENTIONED IN THE NIT; 376-AS PER SCOPE OF WORK MENTIONED IN THE NIT; 376-AS PER SCOPE OF WORK MENTIONED IN THE NIT
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 366-AS PER SCOPE OF WORK MENTIONED IN THE NIT; 366-AS PER SCOPE OF WORK MENTIONED IN THE NIT; 366-AS PER SCOPE OF WORK MENTIONED IN THE NIT
Custom Bid for Services - RCO Audit for Verification and Certification of RCO compliance report for FY 2025 26 at RCF Ltd Chembur, Mumbai Similar Category Hiring of Consultant for Energy Efficiency Services
HDPE bags for packing of Neem Coated Urea
SPARE COMPACT FLAME DETECTOR, Flame Scanner Testing Device
300008433, 300007692, 300123782, 300123783, 300123784, 300123785, 300123786
PULL CORD SWITCH, STEEL WIRE ROPE
Handling and Transport on Lumpsum Basis - Transport Service, Handling and Transport on Lumpsum Basis - Handling Service
Handling and Transport on Lumpsum Basis - Transport Service, Handling and Transport on Lumpsum Basis - Handling Service
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Overhauling of pump cartridge assembly of P-353, GV Lean solution pump of Ammonia Plant at RCF, Thal unit; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Annual rate contract for opening and box up of manhole cover, flanges and miscellaneous cleaning jobs during plant shutdown/breakdown in Suphala plants of RCF Trombay Un..
Facility Management Services - LumpSum Based - Industrial; Pest Control Service, AMC FOR RODENT AND LIZARD CONTROL; Consumables to be provided by service provider (inclusive in contract cost)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Total price including all applicable taxes & duties for: - Application of Corrosion protection coating on Tail Gas Scrubber with Scaffolding erection..
Shaft Sleeves as per Specifications and Drawings
Hiring of Third-Party Inspection Agency - Appointment of Inspection agency for the job of Draft Survey Sampling and Cargo Supervision etc for discharging of Mono Ammonium Phosphate Di Ammonium Phosphate etc in bulk at Indira Dock Mumbai Port Trust; A..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Consultancy services for procurement of E502 BFW Preheaters in Ammonia Plant at RCF Thal unit; Buyer
300026873 GRATING-G. I SIZE: 1M X 0.3M
300079949 BATTERY 12V 180AH EXIDE XP-1800
REFER BIDDING DOCUMENT
LUBE OIL FILTER
AN 89893
AG 89574
C0NVEYOR BELT NYLON, WIDTH 1200MM, 500/4 PLY, 3MM THK. TOPCOVER, 1.5 THK. B OTTOM COVER, GRADE M-24, CUT
COMPLETE PISTON ROD ASSEMBLY FOR AMMONIA BOOSTER COMPRESSOR (K-441/442) AS PER ASSEMBLY DRAWING NUMB
COMPLETE HORIZONTAL, 2-STAGE, RADIALLY SPLIT, BETWEEN-BEARING CENTRIFUGAL PUMP ALONG WITH BASEFRAME
General Items
PIPE BENDING MACHINE
SIMATIC S7-1500R, CPU 1513R-1PN Model No. 6ES7513- 1RM03-0AB0, SIEMENS PLC SPARE, SIEMENS PLC CPU Mounting rail 160 mmModel No.6ES7590-1AB60-0AA0, SIEMENS PLC interface module IM 155-6PN/2 High Feature, Model No.6ES7155-6AU01- 0CN0, PLC S7-1500R ET 200SP, BUS ADAPTER BA 2XRJ45 Model No. 6ES7193-6AR00-0AA0, Digital input module DI 16X24VDC ST Model No.6ES7131-6BH01- 0BA0, PLC S7-1500R communication module for serial connection CM PTP RS422, RS485 and RS232 Model No.6ES7137-6AA01-0BA0
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation, Biennial Maintenance Contract for M/s Siemens make VFDs of Urea Plant at RCF Ltd, Trombay Unit, Chembur, Mumbai; as per..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; NON COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT, ALONG WITH REQUIRED SPARES FOR ANALYSERS INSTALLED IN SOUTH AIR MONITORING STATION, OF ETP, AT RCF THAL, WI..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; NON COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT FOR ABB MAKE SO2, NOX ANALYZER INSTALLED AT HRSG STACK, IN STEAM GENERATION PLANT, AT RCF THAL, WITH OEM ABB..
1.5 MM2 COPPER PIN TYPE TERMINAL(INSULATED) CAT NO. CP-17 CRIMPING DOWEL LUG.
310029768C AM1-I HONEYWELL DCS WS HW & SW UPGRADE
DIAPHRAGM VALVE, RUBBER DIAPHRAGM, BONNET FOR 80MM DIAPHRAGM VALVE
PLATFORM GRATING SIZE: 1 M X 0.30 M. MATERIAL: -M. S. CONFORMING TO IS2062, PLATFORM STEP GRATING OF SIZE 0.7 M X 0.3 M MATERIAL- M. S. CONFORMING TO IS- 2062, PLATFORM GRATING SIZE: -1.0 M X 1.0 M. MATERIAL: - M. S. CONFORMING TO IS2062, PLATFORM GRATING SIZE 1.5 MX 1.0 M MATERIAL: - M. S. CONFORMING TO IS2062
Computer Monitor (V2) (Q2), Cables, Converters and Adapters (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Non-clog sewage submersible pumps (Make: KSB Pumps Limited) along with motor and duck foot bend
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation, NON-COMPREHENSIVE AMC FOR SCADA ROCKWELL MAKE PLC SYSTEM; Service Provider