Loading…
Loading…
1,635 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation, TRANSFORMER OIL TESTING INCLUDING FURAN ANALYSIS OF TRANSFORMER OIL; Service Provider
Dry pencil cells in EES Dept
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; CONTRACT FOR THICKNESS SURVEY OF OLD AMMONIA STORAGE TANK USING PULSE EDDY CURRENT TECHNIQUES AT RCF THAL FOR ONE YEAR; Buyer
3TR Watercooled Flameproof Fancoil Unit
HDPE Bottles for Packing Liquid Biola
COMPLETE ACTUATOR WITH ACCESSORY AND SPARES
300150651 AM1-I, ELECTROPNEUMATIC POSITIONER 3582I
CT Spares
AMIDE ANALYSIS AMPULE, AMMONIA SAMPLE HEADS
Stainless Steel Fittings
SS plate 6mm
LOADING RING, CLAMPS
FILLER WIRE AS PER AWS A-5.9 ER-310 FOR SS-310 MATERIAL. SIZE : 1.6 MM DIA X 1000 MM LONG.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation, Annual Maintenance Contract of Fire alarm system installed in Central Stores, All Workshops, Training center, R&D Agric..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; CONTRACT FOR REPLACEMENT of HE-103 GAS-GAS EXCHANGERS IN OLD & NEW MAP AT RCF THAL; Buyer
LOG BOOKS AND LOG SHEETS
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Lining up of contract for Replacement of Convertor V-101 in old and new MAP at RCF THAL; Buyer
300147186 WEIGH HOPPER ASSEMBLY (3 LOAD CELL) COMPLETE WITH PNUEMATICS, 300147185 WEIGH HOPPER ASSEMBLY FRAME (3 LOAD CELL)
GRAPHITE HEAT EXCHANGER
300121900 - AM5-P705 TSP PUMP MAIN HEAD LIQ END - RCFL Mumbai
300078812 - BEARING 22224 EK C3, SPHERICAL ROLLER - RCFL Mumbai, 300078332 - BEARING 22224 EK C3, 300078369 - BEARING PLUMMER BLOCK SNL-524-620. - RCFL Mumbai
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 355-as per scope of work mentioned in the NIT; 355-as per scope of work mentioned in the NIT; 355-as per scope of work mentioned in the NIT
Facility Management Services - LumpSum Based - Industrial; As per SOW; Consumables to be provided by buyer
As per NIT
Handling and Transport on Lumpsum Basis - Transport Service
Tentage Service Lumpsum Based - Grand total Price including all taxes & duties as per SOW and quantum of job for Erection of Monsoon Protection Shed of MS Structure at MBPT HAY BUNDER Plot; Grand total Price including all taxes & duties as per SOW an..
300011440 - BEARING LINER, 560000096 - BEARING LINER, 310001401- THRUST WASHER
LIQUID NITROGEN, TRANSPORTATION OF 200L DEWAR (PER TRIP), RENTAL CHARGES FOR 200L DEWAR/DAY
DIGITAL MULTIMETER, AC-DC CLAMP METER
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation, DETAILED ELECTRICAL SYSTEM ANALYSIS OF EXISTING ELECTRICAL SYSTEM; Service Provider
SPIRAL WOUND GASKET
RELAY FINDER 44.62, 24VDC, 10A DPDT 2CO
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; UNSKILLED MANPOWER SUPPLY FOR CHUTE AND HOPPER CLEANING, MISCELLANEOUS JOBS & ADMINISTRATIVE AND LOGISTICAL SUPPORTERS FOR 2 YEARS IN PHP AT RCF THAL; Buy..
BACK PULL OUT ASSEMBLY, VOLUTE CASING
Reverse Osmosis membranes
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; SUPPLY OF UNSKILLED MANPOWER FOR MISCELLANEOUS JOBS IN AMMONIA PLANT AT RCF THAL; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; As per
300155921, 300155920, 300155923, 300155922, 300155924, 300155925
GWR LEVEL XMTR WITH EXTERNAL CAGE FOR TAG 90LT550, GWR LEVEL XMTR FOR TAG 14LT864/867, GWR LEVEL XMTR FOR TAG 14LT861, GWR LEVEL TRANSMITTERS FOR TAG 25LRC56
100% water soluble FCO grade mono ammonium phosphate
Certified paddy seeds (karjat-7) Certified paddy seeds (karjat-7), CERTIFIED PADDY SEEDS (JAYA)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 286-AS PER SCOPE OF WORK MENTIONED IN THE NIT; 286-AS PER SCOPE OF WORK MENTIONED IN THE NIT; 286-AS PER SCOPE OF WORK MENTIONED IN THE NIT
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; MAINTENANCE JOBS OF SCRAPER I & II IN PHP BAGGING PLANT RCF THAL; Buyer
SO2 cylinder
PAP E- CARBON BRUSHES, MARATHON MOTOR
AM1-E, PANEL HEALTH MONITORING SYSTEM
BEARING 6203-2Z, BALL DEEP GROOVE WITH SHIELD ON BOTH SIDES, Make:- SKF/FAG/NTN/TIMKEN
QUICK EXHAUST VALVE 1/4", QUICK EXHAUST VALVE 1/2", QUICK EXHAUST VALVE 3/4", QUICK EXHAUST VALVE 3/8"
instrument air filter
WAGON LOADER ELECTRICAL PANEL