Loading…
Loading…
1,637 results • Latest
MPNA M P19 COUPLING THD, MPNA M P19 PUMP SHAFT, MPNA M P19 BUSH SUCTION BELL, MPNA M P19 IMPELLER SEAL RING, MPNA M P19 BUSH INNER BOWL, MPNA M P19 THRUST RING, MPNA M P19 THRUST RING RETAINER, MPNA M P19 PARALLEL KEY, MPNA M P19 SLEEVE, MPNA M P19 HEX BOLT COL DH, MPNA M P19 BUSH P BOX, MPNA M P19 STUD NUT, MPNA M P19 CAP SCREW P BOX, MPNA M P19 IMPELLER, MPNA M P19 BUSH DISCHARGE BOWL, MPNA M P19 CUTLESS BUSH, MPNA M P19 LINE SHAFT, MPNA M P19 FLEXIBLE COUPLING ASSEMBLY, MPNA M P19 PARALLEL KEY PUMP SIDE, MPNA M P19 PARALLEL KEY MOTOR SIDE, MPNA M P19 LOCATING NUT, MPNA M P19 ADJUSTING NUT, MPNA M P19 HEAD SHAFT, MPNA M P19 THRUST BEARING HOUSING ASSY, MPNA M P19 DEFLECTOR, MPNA M P19 LANTERN RING, MPNA M P19 SPLIT PACKING GLAND, MPNA M P19 PACKING BOX ASSEMBLY
HRSG CONTROL VALVE SPARES
MPNA PLUG VALVE 1 2 150 XOMOX SW ENDS, MPNA PLUG VALVE 1 150 XOMOX SW ENDS, MPNA PLUG VALVE 2 150 XOMOX WELDED, MPNA PLUG VALVE 3 150 XOMOX BW ENDS, MPNA PLUG VALVE 6 150 XOMOX BW ENDS
300158474 TRANSMITTER FOR MEASURING DISSOLVED OXYGEN, 300158475 SENSOR FOR MEASURING DISSOLVED OXYGEN
2/2 WAY PULSE JET SOLENOID VALVE
BRIQUETTE BIOMASS Ground Nut Saw Dust_ 100001301_ RCF
Pressure Switch - 60 KG/CM2G, EX-PROOF PRESSURE SWITCH, MODEL: GE-204-02-A6K33, FLAME-PROOF PRESSURE SWITCH MODEL: GE-204-02-A4K-33, FLAME-PROOF PRESSURE SWITCH MODEL: GE-204-02-D4B-33
AL88885 SPARES FOR BUTTERFLY VALVE
AG 88832
GAP Fluid VG 32
CARBON STEEL GATE VALVE, CARBON STEEL NRV VALVE
saunder valve body, SAUNDER VALVES ACTUATOR
Spares for PAC Control Panel
Welding Electrode
Biomass Briquette Agrowaste_ 100001213_ RCF
Heavy duty rack. MOC- Mild Steel. TypeAdjustable pallet racks. Minimum load per layer-100 kg. Minimum n
Facility Management Services - LumpSum Based - Industrial; HIRING OF MANPOWER FOR MISCELLANEOUS PROCESS RELATED JOBS IN EFFLUENT TREATMENT PLANT; Consumables to be provided by buyer
NANO DAPLABELS
Goods Transport Services - Per MT - Dangerous/Hazardous; Oil/Gas Tanker Truck; Heavy Tanker
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; DISMANTLING OF OLD DIVERTED TROLLEYS CS STRUCTURE & REPLACEMENT BY FABRICATION ERECTION OF NEW DT TROLLEYS 10 NOS MADE UP OF SS STRUCTURAL ITEMS IN PHP AT..
MAGNETIC FLOWMETER
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation, Biennial Maintenance Contract of M/s Schneider make 11 KV Switchgear Panels and VCBs of STP1 and Methanol Plant at RCF ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Biennial Rate Contract for Overhauling, Testing & Calibration of Woodward Governors at works of Ms Sicagen India Limited, on proprietary basis; AS PER SCO..
CONTRACT FOR RENOVATION OF VIP WING AT SECOND FLOOR OF ADMINISTRATIVE BUILDING AT RCF THAL
RING WEAR CASING PART NO. # 5020_ 300156815_ RCF, RING WEAR IMPELLER PART NO. # 5030_ 30015816_ RCF
Strainer
Manpower Outsourcing Services - Minimum wage - Semi- skilled; AS PER
SS PIPE. SIZE: 2" NB x SCH 40. MOC: ASTM A312 TP304L, SEAMLESS. ENDS: PLAIN. LENGTH SHALL BE MIN. 5, TEE 2" X1" SCH 10S X SCH 10S BW A 403 WP 304, SEAMLESS STAINLESS STEEL ELBOW 90DEG, LONG RADIUS, SIZE: 2 INCH NB X SCH 40 ENDS: BUTT WELD ENDS MOC
750KVA DIESEL GENERATOR SET, INSTALLATION AND COMMISSIONING, SUPPLY OF PIPING AND STRUCTURAL MATERIAL, INSTALLATION AND COMMISSIONING EXHAUST, SUPPLY OF OFFLINE AND ONLINE PIPING, INSTALLATION AND COMMISSIONING OF OFFLIN, FOUNDATION AND CIVIL- RELATED WORKS, FOUNDATION FOR EXHAUST STACK, SUPPLY OF SPARES AS PER CLAUSE A11 OF SS, INSTALLATION AND COMMISSIONING EARTHING, CHARGES FOR OBTAINING STATUTORY APPROVAL, AMC FOR 1ST YEAR, AMC FOR 2ND YEAR, AMC FOR 3RD YEAR, AMC FOR 4TH YEAR, AMC FOR 5TH YEAR, REMOVAL AND SHIFTING OF THE OLD DG SET, THIRD PARTY INSPECTION CHARGES
Facility Management Services - LumpSum Based - Industrial; Lining up of short term contract for Hiring of manpower on contract basis to carry out various miscellaneous jobs at Suphala and ANP Bagging Section of BMH dept at RCF Trombay unit; Consumabl..
NOTICE INVITING TENDER FOR ARC OF LT MOTORS REWINDING JOB AT RCF THAL
Intermediate Absorption Tower
FLOW METER
Cooling Water Pump Spares
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; preventive maintenance job of the main air blower AS PER SOW AND Quantum of job; Service Provider
SPLIT AC UNIT, 1.5 TR, EWS-SAC MOUNTING BRACKET STAND 1.5-2TR
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; E 965 Replacement of Complete furnace assembly of DBN & RHS in Suphala plant at RCF, Trombay Unit; As per SOW
Ammonium molybdate
Unbranded Non-foldable Platform Trolley
LINEAR TRANSMITTER
300002001 TRANSFORMER PCB FOR BATCH CONTROLLER, 300002003 DISPLAY UNIT & CONTROL PCB FOR BATCH CONTROLLER
CONTACTOR PWR, L&T, 230VAC, MNX 400, L&T FNX 400 SFU
Facility Management Services - LumpSum Based - Industrial; Annual Rate contract for Handling of Product Spillage and Weighment of Product bags in Bagging plants of Trombay Unit; Consumables to be provided by service provider (inclusive in contract co..
FAN, HVLS, PMSM OF DIA 12 FEET
AN 89217
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Value Based Biennial Rate Contract for Corrosion Protection of Underground Pipeline by Protective Coating in Various Plants, at RCF Trombay Unit; As ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; As per
DCS MCB
Internal and Misc. painting work in RCF Township at Chembur, Mumbai-400074
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Total price including all applicable taxes & duties for Re- Blading and HighSpeed Balancing of compressor rotor for GHH Process air compressor in Med..