Loading…
Loading…
17 results • Recent activity
Construction of VUP for rectification of blackspot ID PB 03 164 of series 2017 19 at km. 287.710 Grain Market Bhikhi on NH 148B in the State of Punjab including utility shifting and excluding GST
CS for AE for Construction 4lane-PS GGM-Alwar road (NH-248A) Nuh-FZR Jhirka up to RJ Border (46.95-95.97(DC.96.980) excld 50.900-54.46 nd 61.900-65.18) strength-imp of existing road 6.84 length in Malab vill (50.900-54.46) Bhadas vill (61.900-65.18)
Short Term Maintenance STMC on Jalandhar Kapurthala Sultanpur Lodhi road from RD 12 720 to 29 000 Km and from RD 36 250 to 37 680 Km of NH 703A
Construction 4lane-PS GGM-Alwar road (NH-248A) Nuh-FZR Jhirka up to RJ Border (46.95-95.97(DC.96.980) excld 50.900-54.46 nd 61.900-65.18) strength-imp of existing road 6.84 length in Malab vill (50.900-54.46) Bhadas vill (61.900-65.18) Nuh Haryana
Widening and Upgradation of Road from 2 lane with PS to 4 lane with PS for Rectification of blackspot ID No PB 03 186 at Location Km. 154310 Rureke Kalan on NH703 in the State of Punjab Job No Rureke Kalan on NH703 Punjab 2024 25 RSE 33 including uti
Short Term Maintenance Of Tarn Taran Kapurthala Road NH 703AA At Km 0 00 To 50 25 In Dist Tarn Taran And Kapurthala.