Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance | ₹3.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.6 CrAdmitted-Finance MARC HOUSE PLOT NO 2264 SECTOR 2 BEHIND SECTOR 2 POLICE STATION BAHADURGARH HARYANA 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹4.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹4.7 CrAdmitted-Finance | ₹4.7 Cr | L3 | Admitted-Finance |
| 4 | L4₹4.9 CrAdmitted-Finance F 33 3 OKHLA INDUSTRIAL AREA PHASE 2 DELHI 110020 | SOUTH | DELHI | 110020 | ₹4.9 Cr | L4 | Admitted-Finance |
| 5 | L5₹5.0 CrAdmitted-Finance T 10 3RD FLOOR CITY CENTRE PRESS COMPLEX PLOT NO 1 M P NAGAR ZONE I BHOPAL M P 462011 | BHOPAL | BHOPAL | MADHYA PRADESH | 462011 | ₹5.0 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Artefact Projects Ltd. L7 | Technocrats Advisory Services Pvt. Ltd. L6 | ARKITECHNO CONSULTANTS (INDIA) PVT. LTD. L12 | PIONEER INRA CONSULTANTS PVT. LTD. L8 | AYOLEEZA CONSULTANTS PVT. LTD. L9 | Geo Designs and Reserch Pvt. Ltd. L11 | L N MALVIYA INFRA PROJECTS PVT LTD L5 | Sterling Indo Tech Consultants Pvt Ltd. L10 | Indian Engineering Consultants India Pvt Ltd L3 | Lion Engineering Consultants Private Limited L13 | Almondz Global Infra Consultant Limited L4 | Marc Technocrats Limited L2 | MSPARK Futuristics & Associates L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00I. Remuneration for Local Professional Staff: For Project with Construction Period of 24 months + DLP Period of 60 months Professional Staff: | ||||||||||||||||
| 1.01 | Team Leader cum Senior Highway Engineer | 1 | Nos | 1,00,000 ₹39 L | 1,30,000 ₹50.7 L | 2,56,000 ₹99.8 L | 2,00,000 ₹78 L | 1,65,000 ₹64.3 L | 1,12,500 ₹43.9 L | 1,40,000 ₹54.6 L | 1,00,000 ₹39 L | 1,80,000 ₹70.2 L | 1,30,000 ₹50.7 L | 1,40,000 ₹54.6 L | 75,000 ₹29.3 L | 90,000 ₹35.1 L |
| 1.02 | Resident cum Highway Engineer | 1 | Nos | 90,000 ₹75.6 L | 1,00,000 ₹84 L | 90,000 ₹75.6 L | 1,00,000 ₹84 L | 1,10,000 ₹92.4 L | 78,000 ₹65.5 L | 1,00,000 ₹84 L | 1,20,000 ₹1.0 Cr | 1,10,000 ₹92.4 L | 1,05,000 ₹88.2 L | 1,20,000 ₹1.0 Cr | 90,000 ₹75.6 L | 70,000 ₹58.8 L |
| 1.03 | Bridge/Structural Engineer | 1 | Nos | 70,000 ₹27.3 L | 1,10,000 ₹42.9 L | 1,58,000 ₹61.6 L | 1,00,000 ₹39 L | 1,25,000 ₹48.8 L | 78,000 ₹30.4 L | 1,20,000 ₹46.8 L | 70,000 ₹27.3 L | 1,20,000 ₹46.8 L | 1,05,000 ₹41.0 L | 1,10,000 ₹42.9 L | 65,000 ₹25.4 L | 75,000 ₹29.3 L |
| 1.04 | Senior Pavement Specialist | 1 | Nos | 70,000 ₹16.8 L | 1,10,000 ₹26.4 L | 1,58,000 ₹37.9 L | 1,00,000 ₹24 L | 1,15,000 ₹27.6 L | 78,000 ₹18.7 L | 1,10,000 ₹26.4 L | 40,000 ₹9.6 L | 1,00,000 ₹24 L | 1,05,000 ₹25.2 L | 1,10,000 ₹26.4 L | 40,000 ₹9.6 L | 70,000 ₹16.8 L |
| 1.05 | Senior Quality cum Material Expert | 1 | Nos | 70,000 ₹16.8 L | 1,10,000 ₹26.4 L | 1,68,000 ₹40.3 L | 1,00,000 ₹24 L | 1,10,000 ₹26.4 L | 75,000 ₹18 L | 1,10,000 ₹26.4 L | 40,000 ₹9.6 L | 1,20,000 ₹28.8 L | 1,05,000 ₹25.2 L | 1,10,000 ₹26.4 L | 65,000 ₹15.6 L | 70,000 ₹16.8 L |
| 1.06 | Road Safety Expert | 1 | Nos | 70,000 ₹16.1 L | 70,000 ₹16.1 L | 90,000 ₹20.7 L | 75,000 ₹17.3 L | 80,000 ₹18.4 L | 1,12,500 ₹25.9 L | 1,00,000 ₹23 L | 10,000 ₹2.3 L | 10,000 ₹2.3 L | 50,000 ₹11.5 L | 70,000 ₹16.1 L | 25,000 ₹5.8 L | 15,000 ₹3.5 L |
| 1.07 | SUB-TOTAL-1 | 1 | Nos | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 2.00SUB-PROFESSIONAL STAFF : | ||||||||||||||||
| 2.01 | Survey Engineer | 1 | Months | 25,000 ₹8.5 L | 50,000 ₹17 L | 38,000 ₹12.9 L | 27,000 ₹9.2 L | 40,000 ₹13.6 L | 46,000 ₹15.6 L | 35,000 ₹11.9 L | 35,000 ₹11.9 L | 30,000 ₹10.2 L | 55,000 ₹18.7 L | 30,000 ₹10.2 L | 40,000 ₹13.6 L | 20,000 ₹6.8 L |
Tender Value
₹310.4 Cr
Closing Date
19 Sept 2025, 5:00 pmClosed
Regional Officer MoRTH Jaipur
Regional Office, MoRTH, Kendriya Sadan, 6th floor, Room No.611, Sector - 9A, Chandigarh - 160009
CS for AE for Construction 4lane-PS GGM-Alwar road (NH-248A) Nuh-FZR Jhirka up to RJ Border (46.95-95.97(DC.96.980) excld 50.900-54.46 nd 61.900-65.18) strength-imp of existing road 6.84 length in Malab vill (50.900-54.46) Bhadas vill (61.900-65.18)
2025_MoRTH_872311_1
RW/CH/W(53)/HR/2025/dt.6.8.25
Open Tender
Consultancy
730 days
HARYANA
As per tender docuements
4 documents required · 4 mandatory
₹5,000
RPAO(nh)
Exempted
Regional Office MoRTH Chandigarh
27 Jan 2026
6 Aug 2025
22 Sept 2025
6 Aug 2025
19 Sept 2025
6 Aug 2025
6 Aug 2025 - 29 Aug 2025
29 Aug 2025
I. Remuneration for Local Professional Staff: For Project with Construction Period of 24 months + DLP Period of 60 months Professional Staff:
Team Leader cum Senior Highway Engineer
Resident cum Highway Engineer
Bridge/Structural Engineer
Senior Pavement Specialist
Senior Quality cum Material Expert
Road Safety Expert
SUB-TOTAL-1
SUB-PROFESSIONAL STAFF :
Survey Engineer
Assistant Highway Engineer
CAD Expert
Environmental Engineer
Assistant Bridge Engineer
Assistant Quality cum Material Engineer
Quantity Surveyor
SUB-TOTAL-2
Total(Sub Total 1 + Sub Total 2):
II. SUPPORT STAFF
Office Manager (24+60 = 84 months)
Accountant cum Cashier (24 months)
Steno cum Computer Operator (24+60 = 84 months)
Office Boy (1 no) (24+60 = 84 months)
Note : Billing rates as indicated above shall be increased in accordance of clause 6.2(a) Special Conditions of Contract for the personnel of all categories namely (i) key Personnel; (ii) sub-professional personnel and (iii) Support staff. The increase as above shall be payable only on the remuneration part of Key Personnel, Sub-Professional Personnel and support staff. However, for evaluation of Bid propsals, the quoted initial rate shall be multiplied by the total time input for each position on this contract, i.e. without considering the increase in the billing rates.
Total:
III. Transportation (Fixed rate on rental basis) *The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Innova or equivalent not more than 2 years old) (1*24 (Construction Period) + 1*12 (DLP)) =36 Rate per month
Scorpio or equivalent 4 x 4 vehicles (not more than 2 years old) (1*24 (Construction Period)) Rate per month
Bolero or equivalent 4 x 4 vehicles (not more than 2 years old) (1*24 (Construction Period) + 1*60 (DLP)) =84 months Rate per month
Total:
IV. Duty Travel to Site (Fixed Costs) (For all Lengths of projects): Professional and Sub- Professional Staff (Trips)
To Head Quarter
To Regional Office, Chandigarh
Total:
V. Office Rent (Fixed Costs) - Minimum200 sq m area of office shall be rented. The rent cost includes maintenance, cleaning, repairing etc. complete (Rate per Month)
200 sqmt (During Construction period)
50 sqmt (During Maintenance /DLP period)
Total:
VI. OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) (Monthly Rate) 24 months (Consturction) + 60 months (Maintenance)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Total:
VII. OFFICE FURNITURE AND EQUIPMENT (Rental)
During Construction period (24 months)
During Maintenance /DLP period (60 months)
The cost shall include rental charges towards all such furniture and equipmentas required for proper functioning of office. Office furniture shall include executivetables, chairs, visitorchairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone(2external & 10internallines),photocopier(15ppm,12000copiesper month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD- 250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded antivirus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
Total:
VIII. REPORTS & DOCUMENTS PRINTING (Rate per Copy)
Monthly reports (Design and Construction) No. of Reports-84 x No. of Copies-3 (84x3)
Half yearly Reports No. of Reports-8 x No. of Copies-3 (8x3)
Various others reports as provided in the Concession Agreement such as Completion Report No. of Reports-3 x No. of Copies-3 (3x3)
Total:
Road Survey Equipment (Rate per Km / Nos) The cost shall include carrying out survey using equipment, manpower, software and report processing.
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement strength measurement using FWD
Bridge inspection using Mobile Bridge Inspection Unit
Road signs inspection using Retro Reflectometer
Total:
Contingencies:
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from Competent Authority in MoRT&H / Bro. (Fixed Amount of Rs. 10,00,000 shall be entered)
Total Cost Net of Goods and Service Tax: **Total cost net of Goods and Service Tax shall be considered for Financial Evaluation. Note: Payment will be made as per stipulations of the conditions of conntract.
Goods and service Tax
TOTAL COSTS (Including GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
RFP_HR_AE_248A.rar
RAR • 3.94 MB
BOQ_916974.xls
BOQ • 0.28 MB
RFP_HR_AE_248A.pdf
PDF • 7.61 MB
Download all tender documents and submit your bid