Loading…
Loading…
20 results • Latest
Short Term Maintenance Work from Km. 196.00 to Km. 200.00 on NH 534 309 old 119
Short Term Maintenance Work from Km. 233.00 to Km. 311.00 49 Km on NH-707 A
Widening and Strengthening Reconstruction of Existing 2 Lane To 2 Lane with Paved Shoulder Configuration from existing km 338.100 to km 368.000 of NH-58 In the State of Uttarakhand. Routine Maintenance works Under Debitable agency
Construction of Box Culvert in km 134 HM (8-10) (Tunera Gadhera) and Protection work along with Saryu River in Km 134 HM (8-10) and Km 135 HM (0-2 to 4-6) of NH 309A under Annual Plan 2025-26 in the State of Uttarakhand
Consultancy Services Authority Engineer for supervision of Rehabilitation and upgrading to two lanes with paved shoulders and Strengthening of Kotdwar-Pauri Srinagar road section from Km 232.00 to km 274.470 on NH-119 New 534 Paidul to Srinagar
Treatment of landslide zone 02 Location (Ch 100.572 to 100.792 KM on NH-09 and Ch. 170.075 km to 170.150 km and Ch. 170.350km to 170.325) on NH-125 (New NH-09) in the state of Uttarakhand under Annual Plan 2024-25