Loading…
Loading…
20 results • Latest
Landslide treatment work from Ch. 269.900 km to Ch. 270.214 km (Crown portion at Totaghati) on NH-07 (old NH-58) in the State of Uttarakhand under Annual Plan 2025-26 - under EPC mode
Treatment of 01 nos of landslide location at Ch. 91.125 to 91.415 (near Gulabghati) on NH- 109 (old NH 87 ) in the state of Uttarakhand under Annual Plan 2025-26
Treatment of 16 no of landslide location on NH-134 under EPC mode in the state of Uttarakhand under Annual Plan 2025-26
Construction of 4 laning of Rishikesh Bypass from Design Chainage km 529.750 Near Teenpani Flyover on NH7 to Design Chainage km 542.420 Near Kharasrote Bridge passing through Bhattowala and Dhalwala Village in the State of Uttarakhand Design Length
Treatment of 11 No. of landslide location on (Kotdwar to Dugadda) of NH-534(old NH-119) in the State of Uttarakhand under Annual Plan 2025-26
TREATMENT OF 04 LANDSLIDE LOCATIONS CH 102pt66 KM TO CH 102pt885 KM ON PITHORAGARH TAWAGHAT ROAD AND CH 4pt680 KM CH 4pt880 KM CH 4pt890 KM CH 5pt250 KM AND CH 5pt733 KM CH 5pt833 KM IN TAWAGHAT GHATIABAGARH SECTION OF NH 09 OLD NH 125 IN THE UK