Loading
Loading…
Loading…
2 results • Latest
Construction of Balance Work of Lifts from Auckland area to Police Chowki Lakkar Bazar in Smart City area based development.
Earth work in surface excavation not exceeding 30 cm in (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
Development,operation and maintenence of passenger ropeway from narkanda to hatu peak, distt. shimla on design,build,finance,operate and transfer (DBFOT)mode
Premium in the form of revenue share at the rate of percentage (%)