Loading…
Loading…
139 results • Latest
Execution of RPWS to Left out village Nunvet under Jamankira block.
Execution of RPWS to Left out village Banmal under Jamankira block.
Execution of RPWS to Left out village Gariabahal under Jamankira block.
Execution of RPWS to Left out village Kadalipali under Jamankira block.
Execution of RPWS to Left out village Patrapali under Jamankira block.
Execution of RPWS to Left out village Gadapati under Jamankira block.
Construction of D Type Quarter for Divisional Account Officer, RWSS Division, Rairangpur At - RWSS Campus, Mahuldiha, Rairangpur in the District of Mayurbhanj.
Construction D Type Quarter for Assistant Executive Engineer (Estimator) RWSS Division, Rairangpur At - RWSS Campus, Mahuldiha, Rairangpur in the District of Mayurbhanj.
Construction of E type ear marked Quarter for RWSS Section Bahalda at Bahalda RWSS Sub Division Office Campus under RWSS Division Rairangpur in the District of Mayurbhanj
Construction of D type ear marked Quarter for Assistant Executive Engineer RWSS Sub Division Rairangpur II at Bahalda RWSS Sub Division Office Campus under RWSS Division Rairangpur in the District of Mayurbhanj
Construction of Section office building of RWSS Section, Phiringia with boundary wall
RPWS to village Budhapanka and its adjoining villages from Jhadiamba WTP under Banarpal Block in Angul District. (including OM 5Years)
SUPPLYING OF DRINKING WATER TO GOVT. (SSD) GIRLS HIGH SCHOOL, BIJRAGUDA UNDER TENTULIKHUNTI BLOCK PERTAINING TO NABARANGPUR DISTRICT.
POWER SUPPLY TO PWS POINT AT KAKIPADU INCONNECTION WITH PWS TO BADAPADU G.P NUAGAON UNDER POTTANGI BLOCK
POWER SUPPLY TO PWS POINT AT DALARANGINIGUDA INCONNECTION WITH PWS TO DALARANGINIGUDA G.P PUKALI UNDER POTTANGI BLOCK
Construction of Pump house, Distribution system, lowering of pump motor , construction of sluice valve chamber and internal wiring for RPWS to Kanpur of Barhadomunda GP under Rajkanika Block in Kendrapara District
Construction of Pump house, Distribution system, lowering of pump motor , construction of sluice valve chamber and internal wiring for RPWS to Ujanga of Parinuapada GP under Rajkanika Block in Kendrapara District
Supply of outsourcing staff for 6 no of subdivision working under Mechanical RWSS Division,Sambalpur
Supply of outsourcing staff for 6 no of subdivision under Mechanical RWSS Division,Sambalpur
Supply of outsourcing staff for 6 no of subdivision under Mechanical RWSS Division,Sambalpur
Supply of outsourcing staff for 6 no of subdivision under Mechanical RWSS Division,Sambalpur
Supply of outsourcing staff for 6 no of subdivision under Mechanical RWSS Division Sambalpur
Supply of outsourcing worker for 6 no of subdivision under Mechanical RWSS Division,Sambalpur
Supply and Installation of Equipments, Glassware, Furniture with desktop etc. at Sub-Divisional Water Testing Laboratory, Mathili under RWSS Division, Malkangiri in Malkangiri District
Supplying all materials, labour, T and P, construction of 11KV 3Ph 400 volt 6KW external Power Supply and 3-phase service connection to RPWS at Limalori under Chitrakonda Block with testing, commissioning and handing over to TPSODL
Supplying all materials, labour, T and P, construction of 11KV 3Ph 400 volt 6KW external Power Supply and 3-phase service connection to RPWS at Nerudipalli under Chitrakonda Block with testing, commissioning and handing over to TPSODL
Supply ofISImarked steel tubes used in water wells of type electric resistance welder (ERW) confirming to IS-4270/2001 with subsequent amendments if any having length of 6.05 mtrs cutting tolerance (0.00mtr plus 0.05mtr)andbothsides beveled.
LAYING OF PIPELINE, FITTING OF VALVES, CONSTRUCTION OF STAND POST DURING IMPROVEMENT OF PWD ROAD FROM TELKOI TO KALIAHATA FROM CH. 21/370 KM to CH.44/520 KM FOR PWS TO BIMALA, RANIBEDA, BENAMUNDA AND KALIAHATA UNDER TELKOI BLOCK.
CONSTRUCTION OF 6 MTR DIA 13.50 MTR DEPTH RR STONE MASONARY PERCOLATION WELL WITH MS COVER ETC COMPLETE IN CONNECTION WITH PWS TO 2 NOS OF CLUBBED UP PWS SCHEMES UNDER SEMILIGUDA BLOCK UNDER BASUDHA PROGRAMME
CONSTRUCTION OF 6 MTR DIA 13.50 MTR DEPTH RR STONE MASONARY PERCOLATION WELL WITH MS COVER ETC COMPLETE IN CONNECTION WITH PWS TO 3 NOS OF CLUBBED UP PWS SCHEMES UNDER POTTANGI UNDER BASUDHA PROGRAMME
POWER SUPPLY TO PWS POINT KUMBHARLIMIKA INCONNECTION WITH PWS TO KUMBHARLIMIKA PADMAPUR GP UNDER KORAPUT BLOCK
POWER SUPPLY TO PWS POINT AT 132 33 KV GRID SUBSTATION OPTCL AT LUGUM GP BALLEL UNDER LAMTAPUT BLOCK
POWER SUPPLY TO PWS POINT AT ERASANTAGUDA INCONNECTION WITH PWS TO SIPAIPUT OF MALIPUT GP UNDER POTTANGI BLOCK
Rural Piped Water Supply to Jhodipai GP Chanabada of Dasamantpur block under Koraput District DMF Programme
Rural Piped Water Supply to Tourist place Punjisil GP Mujanga of Dasamantpur block under Koraput District (DMF programme)
Execution of RPWS to Left out village Kundankhol under Jamankira block.
Execution of RPWS to Left out village Budhikuntuni under Jamankira block.
Execution of RPWS to Left out village Sareipali and Balarama under Jamankira block.
Execution of RPWS to Left out village Badakundeswar under Jamankira block.
Construction of E-type Quarter at RWSS Section-III Daringibadi under RWSS Division Phulbani.
Construction of office building for RWSS section Koira under RWSS Division Rourkela
construction of 4 mtr dia RCC intakewell and pipelaying,20000 ltr sump
Construction of 04 nos F Type staff Quarter G PLUS 1 for RWSS Division Staff Bhadrak
Renovation of the existing Conference Hall in the office of Additional Chief Engineer, RWSS Circle, Bhubaneswar
Construction of Sub-Divisional Water Testing Laboratory at RWSS Sub-Division, DELANG in Puri District.
SUPPLYING ALL LABOUR T AND P FOR LAYING OF DISTRIBUTION NETWORK PIPELINE INSTALLATION OF SLUICE VALVE AND CHAMBER DAMAGED DURING PWD ROAD WIDENING WORK AT PWS TO BADABHARANDI AND PUJARIGUDA OF BADABHARANDI G.P UNDER UMERKOTE BLOCK
Procurement of 125 mm dia M.S ERW Casing pipe confirming to IS 4270 2001 for sinking of 125mm x 100 mm dia Tube Well through ODEX method
RFP for Consultancy Services for Authoritys Engineer for Supervision of the work Execution of Rural Piped Water Supply Project pertaining to Mega PWS to 26 GPs of Sambalpur District and 02 GPs of Jharsuguda District including 05 years of O and M
LAYING OF PIPELINE FOR PWS TO GARAM UNDER BALIKUDA BLOCK
LAYING OF PIPELINE FOR PWS TO CHASIKHANDA UNDER BIRIDI BLOCK