Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹43.9 L+₹4.8 L (12.4%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹43.9 L+₹4.8 L (12.4%)Admitted-Fee/PreQual/Technical/Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L2₹43.9 L+₹4.8 L (12.4%)Admitted-Fee/PreQual/Technical/Finance AT KALIDASPUR PO BALIMED PS NAIKANIDIHI DIST BHADRAK PIN 756131 | BHADRAK | ODISHA | 756131 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L2₹43.9 L+₹4.8 L (12.4%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹43.9 L
EMD Value
₹43,892
Closing Date
22 Sept 2026, 5:00 pmClosed
Executive Engineer RWSandS Division Bhadrak
O/o The Superintending Engineer RWSandS Division Bhadrak
Construction of RWSS Section office Banta under RWSS Division, Bhadrak
2026_RWSS_140160_1
EE RWSandS BDK 02/2026-27 Dt-24.08.2026
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
RWSS Division Bhadrak
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹43,892
Yes
23 Sept 2026
5 Sept 2026
23 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
5 Sept 2026 - 18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART-A)Civil Building :-Dismantling brick or stone masonary in lime or cement mortar including stacking the useful materials for re-use and removing the debris within 50 m. lead from work site etc. complete.as directed by the Engineer in charge. | 35.44 | Cum | 1,646.6 | ₹58,355.5 |
| 2 | Dismantling and removing R.C.C column, beams, slab,staircase , landing , lintels including stacking the useful materials for re-use and removing the debris within 50 m. lead from work site etc. complete.as directed by the Engineer in charge. | 27.12 | Cum | 1,731.8 | ₹46,966.42 |
| 3 | Earth work in excavation in all kinds of soil including moorum, stony earth and earth mixed with boulders except sheet rocks and boulders requiring blasting including dressing the leveling the bed up to the required level and depositing the excavated earth away from the site with all leads & lifts including shuttering etc complete in all respect as directed by the Engineer in charge. | 31.59 | Cum | 282.89 | ₹8,936.5 |
| 4 | Supplying filling in foundation and floor bed concrete with clean coarse river sand including watering and ramming with cost & conveyance of all materials, labours, & T & P all taxes royalty etc complete in all respect as per direction of engineer in charge. (measurement will be taken for | 139.61 | Cum | 1,215.22 | ₹1,69,656.86 |
| 5 | PCC (1:3:6) ( IS -2571) in floor bed concrete using 40 mm & below size b.h.c.b granite stone metal of approved quality from approved quarry including lowering laying concrete watering ramming &curing etc compacting to required level laid in layers not exceeding 4’’ thick including cost&curing etc compacting to required level laid in layers not exceeding 4’’ thick including cost conveyance all taxes royalty &cost of all material & labours T&P required for the works etc | 16.27 | Cum | 6,537.19 | ₹1,06,360.08 |
| 6 | Providing bored compacting pile foundation with R.C.C M-20 using 20mm size B. H. G (C.B) chips including cost of bore holes but excluding cost of M.S. rod or Tor steel and labour charges for cutting bending binding etc. complete | 30 | Nos | 7,043 | ₹2,11,290 |
| 7 | RCC ( 1:1½ :3) M-20 having crushing strength of 200 kg/cm2 after 28 days curing as per (IS456-2000 & IS 516) using 12mm to 20 mm size b.h.c.b granite chips 20mm size not exceeding 25% including hoisting lowering laying concrete and compacting by using vibrators watering curing for 28 days centering shuttering &finishing the exposed surface smooth providing grooves beads when ever necessary including cost convince taxes & royalty of all materials & cost of all labour T&P hire charges of concrete mixture machine& vibrator machine required for the work etc. complete in all respect but excluding the cost of M S rod or tor steel & binding wires & labour charges for cutting bending, binding,& tying the grills. As per the direction of Engineer in charge. (a)Pile Cap | 15.92 | Cum | 6,722.5 | ₹1,07,022.2 |
| 8 | Col. Foundation | 1.47 | Cum | 16,476.1 | ₹24,219.87 |
| 9 | Column s/s | 4.62 | Cum | 16,476.1 | ₹76,119.58 |
| 10 | sill band | 1.26 | Cum | 9,844.3 | ₹12,403.82 |
stage.html
html • 0.03 MB
finance_608121.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
DTCN.pdf
Tender Documents • 1.99 MB
BOQ_608121.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .