Loading…
Loading…
51 results • Latest
Improvement of Storm Water Drainage Channel
Select, At Par, Excess (+), Less (-) IOCL Select Excess (+) Less (-) Excess (+) Less (-)
Canal improvement
Clearing & grubbing shrub, jungles including uprooting stumps of trees and trees below 1.0 m. girth and thick bushes including bamboo clamps based on pre-measurement disposing the debris away from the work site with all leads, lifts and delifts with cost of all labour, hiring and running charges of all machineries, cess etc. complete as per direction of Engineer-in-Charge.
Canal lining
Clearing & grubbing shrub, jungles including uprooting stumps of trees and trees below 1.0 m. girth and thick bushes including bamboo clamps based on pre-measurement disposing the debris away from the work site with all leads, lifts and delifts with cost of all labour, hiring and running charges of all machineries, cess etc. complete as per direction of Engineer-in-Charge.
Supply and Installation of 100 KVA Transformer of 11/ 0.4 KV (AL) Pole mounted Sub -Station at Odisha Adarsha Vidyalaya,Olanga under Bhadrak Block, Bhadrak
Sub-station part-25x6 MM GI Flat
Shifting of 11 KV/DTR/LT Line for widening and strengthening of Barikpur-Dhamnagar road from Maa Rice mill to Bhagabanpur Chhaka
Line Part(HT Part)-RS (GI) Joist Pole 150x150 (11Mtr., 34.6
Shifting of 11 KV/DTR/LT Line for widening and strengthening of Barikpur-Dhamnagar road from 250 KVA transformer to 100 KVA Transformer Khanqua S/S
Line Part(HT Part)-PSC Pole 9Mtr. 300 KG