Loading…
Loading…
4 results • Latest
Construction of Boxcell Culvert upon C.D. at RD 13230.00M of SLMC with toe wall and widening of road from RD 13230M to 13600M.
Earth work in excavation of foundation and plinth in hard soil by manual/mechanical means including dressing and levelling the bed and depositing the excavated soil clear of work site with all leads, lifts, delifts and dewatering including removing bushes, stumps and any other foreign materials from the working area including rough dressing and breaking the clods in to 5 cm to 7 cm size including removal of all foreign materials, debrises, grass, bushes, vegetation's, shrubs, roots including laying in layers not exceeding 0.30m in depth as well as from the foundation trenches with cost of all labour, labour welfare cess but excluding GST etc. complete in all respect as per specification and direction of the Engineer-in-Charge.
Improvement to service road of Kenduapada Distry. from RD 2600mtr to 3820mtr and RD 5840mtr to 7600mtr.
Clearing grass and removal of rubbish upto adistance of 50 mtr. Outside the periphery of the area including all taxes and labour charges etc. but excluding GST Complete as per the direction Engineer in Charge.
Improvement to Communication facility from Baula R and B road to Gohirabani Sahi from RD 0.00KM to 2.00KM with Construction of slope protection toe wall and stone packing on river side portion of aflux bundh from RD 0.00M to 300.00M.
Clearing grass and removal of rubbish upto adistance of 50 mtr. Outside the periphery of the area including all taxes and labour charges etc. but excluding GST Complete as per the direction Engineer in Charge.
Improvement to Communication facility on Baitarani left from Dimiria to Habaleswar from RD 6.50KM to 8.20KM.
Clearing grass and removal of rubbish upto adistance of 50 mtr. Outside the periphery of the area including all taxes and labour charges etc. but excluding GST Complete as per the direction Engineer in Charge.