Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.5 Cr
EMD Value
₹8.5 L
Closing Date
3 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Er. Sanjib Kumar Nayak
Office of the CE and BM, Baitarani Basin, Mandua, Kendujhar
IMPROVEMENT TO KATHAPAL MINOR, KESHADURAPAL MINOR, SANTARA MINOR, BASANTAPURA MINOR AND TORANIPAL MINOR
2026_CEBBK_146059_1
CEBBK-KID-16/2026-27
Open Tender
Civil Works - Others
Percentage
365 days
Kendujhar
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹8.5 L
Yes
13 Nov 2026
13 Nov 2026
4 Dec 2026
13 Nov 2026
3 Dec 2026
13 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area etc. & L.W.cess to complete the item of work in all respect as per the direction of the Engineer-in-charge. (Excluding GST) | 49,914.8 | Sqm | 2.9 | ₹1,44,752.92 |
| 2 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. etc. complete with all cost incidental to the work as per direction of Engineer-in-charge. (Excluding GST) | 6,001.46 | Cum | 82.2 | ₹4,93,320.01 |
| 3 | Filling foundation and plinth with sand well watered and rammed etc. Including all cost, carriage, taxes of all materials and labour etc. complete as per direction of Engineer-in-charge. (Excluding GST) | 2,204.81 | Cum | 654.1 | ₹14,42,166.22 |
| 4 | Providing and laying Cement concrete conforming to M-15 grade with hard granite crusher broken coarse aggregate of maximum nominal size of 20mm and down graded mixed with Concrete mixture, laying within initial lead of 50m and intial lift of 1.50m as per approved drawings & specifications with all costs to complete the work, as directed by the Engineer-in-charge. (Excluding GST) . | 1,625.17 | Cum | 6,539.5 | ₹1,06,27,799.22 |
| 5 | Providing & laying R.C.C M-20 grade using 20mm down graded size crusher broken hard granite chips from approved quarry free from weathered skin surface, dust and any other deleterious materials of approved grading including supply of clean sharp sweet sand from approved quarry with Portland cement of ISI standard and grade as approved by the Deptt. Mixing with concrete mixer compacting with vibrator including all labour cost, carriage, royalty, cess | 3,549.89 | Cum | 7,017.6 | ₹2,49,11,708.06 |
| 6 | Supplying, fitting and placing uncoated HYSD bar reinforcement including cost, carriage, royalty complete as per the direction of Engineer-in-charge. (Excluding GST) | 1,596.61 | Qntl | 9,000.2 | ₹1,43,69,809.32 |
| 7 | Providing weep holes in brick masonary plain / Reinforcement concrete, abutment, wing wall, return wall with 100mm dia. AC pipe extending through the full with of the structure with slope of 1V:20H towards drawing foce. Completely as per drawing and technical. (Excluding GST). | 2,858.7 | Rmt | 193.6 | ₹5,53,444.32 |
| 8 | Providing formwork for concrete with F2 finish for all permanently exposed surfaces not prominently exposed to public view such as in galleries, adits, bridges, retaining walls, open spillways etc. with steel shutters or plywood shutters including supply of rigid tie and supports with all labour, materials and T & P complete including finishing complete as directed by the Engineer-in-charge. (abrupt surface irregularities over 5mm and gradual over 10mm measured with 1.5m templete is not permitted). (Excluding GST) | 27,610.24 | Sqm | 1,036.8 | ₹2,86,26,296.83 |
| 9 | Providing P.V.C water stop for drainage gallery as per approved design including fixing in proper allignment and joining with araldite etc. including cost of P.V.C water stop as directed by Engineer-in-charge,. (Excluding GST) | 2,568.76 | Rmt | 827.1 | ₹21,24,621.4 |
| 10 | Filling in foundation & plinth with excavated materials including watering & ramming with leads, lifts & delifts etc. complete as per the direction of E.I.C. (Excluding GST) | 4,000.97 | Cum | 55.3 | ₹2,21,253.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
DTCN.pdf
Tender Documents • 4.12 MB
BOQ_620544.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .