Loading…
Loading…
Found 92 active tenders
92 results • Latest
Quotation for supply of Tyre, Tube and Flap for Back-Hoe Loader.
Construction of New Forester Quarter at Dhenkikote under Keonjhar (K.L) Range
Earth work excavation of foundation in stoney earth and gravels mixed with stone and boulders within initial lead of 50m and initial lift of 1.5m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge.
APPOINTMENT OF PROOF ENGINEERING CONSULTANT (PEC) FOR Construction of Distribution system for 5052.68 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 60.304 km to 71.505 km through UGPL.
Providing Proof Engineering Consultancy Services for vetting the planning & design, report & drawing etc. as per the agreed plan based on the submission of plan of the EPC contractor. The services shall be provided complete in all respect required for procurement & construction of UGPL network for achieving the desire command area successfully for 5052.68 Ha. of Salandi Left Main Canal from RD 60.304 km to 71.505 km including submission of Report.
APPOINTMENT OF THIRD-PARTY INSPECTION AGENCY (TPIA) FOR Construction of Distribution system for 5052.68 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 60.304 km to 71.505 km through UGPL.
Consultancy charges for QC/QA Planning& getting approval from CCE, Anandapur Barrage Project, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/store including site inspection and checking of material and equipment’s used as per design & specification approved by the Chief Construction Engineer, ABP and submitting the final report of canal network and CAD work for 5052.68 Ha of Salandi Left Main Canal from RD 60.304 km to 71.505 km including submission of Report.
Construction of Boxcell Culvert over local nallah at 49/150 km on Nudurpada - Kaliahata road in the district of Keonjhar under State Plan for the year 2025-26
and lead of 1000 metres etc. complete as per Clause No. 202 of Section 200 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Construction of Taladihi Colony Chhaka to Suadhala Via-Gobara Sahi road under MMSY-TRIP in the District of Keonjhar.
Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202