Loading…
Loading…
6 results • Latest
Construction of Mission Shakti Bazar at Phulbani Kandhamal
Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5 m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge.
Repair and Renovation of Different Infrastructure at EMRS Lahunipara under Lahunipara Block
Removing old tarfelt from roof slab cleaning the surface, lowering and removing the debreis within 50 M lead. Etc complete
Const. of 100 seated ST Hostel at Basipitha High School under Khunta Block
Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014 cum in volume within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the dept.
Const. of New Fish Market Complex of RMC Market at Udala under Udala NAC
Earth work in excavation of foundation trenches in hard soil including dressing and levelling the bed up to 3.00 meter depth and depositing the excavated earth away from the work site if required with cost of all labour, T&P required for the work etc. complete as per direction of the Eng.-in-charge
Const. of New Market Complex of RMC Krusaka Bazer at Udala under Udala NAC
Earth work in excavation of foundation trenches in hard soil including dressing and levelling the bed up to 3.00 meter depth and depositing the excavated earth away from the work site if required with cost of all labour, T&P required for the work etc. complete as per direction of the Eng.-in-charge
Const. of Drain and Protection Wall in Pond of RMC Market at Udala under Udala NAC
Earth work in excavation of foundation trenches in hard soil including dressing and levelling the bed up to 3.00 meter depth and depositing the excavated earth away from the work site if required with cost of all labour, T&P required for the work etc. complete as per direction of the Eng.-in-charge