Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹36.9 L
EMD Value
₹36,900
Closing Date
26 Nov 2026, 5:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer
O/o SE, Salandi Canal Division, Bhadrak
CONSTRUCTION OF CONFERENCE HALL WITH MOTOR CYCLE STAND
2026_SCDBH_145966_6
e-Procurement Notice No.SAL-BDK-4-P1/2026-27
Open Tender
Civil Works - Buildings
Percentage
120 days
Bhadrak
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹36,900
Yes
12 Nov 2026
12 Nov 2026
27 Nov 2026
12 Nov 2026
26 Nov 2026
12 Nov 2026
12 Nov 2026 - 18 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work for excavation of foundation in hard soil including dressing and leveling the bed and depositing the excavated materials away from the working area for filling at required places with all leads, lifts & delifts including all labour T&P L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-charge. (Excluding GST) | 56.48 | One Hundred Cum | 28,650 | ₹16,18,152 |
| 2 | Filling , foundation & plinth with sand well watered and rammed including all labour T&P cost, carriage, royality & L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-charge.Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) | 41.46 | One Cum | 936.8 | ₹38,839.73 |
| 3 | Cement Concrete M-15 Grade using 40mm. size down graded crusher broken hard granite good quality chips free from weathered skin and any other deleterious materials using screened and washed coarsed sand from approved quarry and Portland cement of ISI standard and grade as approved by the Deptt. including watering for curing for speficied days and all labour T&P cost,carriage,royality & L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-charge.Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) | 19.98 | One Cum | 6,502.1 | ₹1,29,911.96 |
| 4 | Brik work with Flyash Briks masonary in cement mortar(1:6) in super structure using 250x120x80mm. size having crushing strength not less than 75mg/cm2 with dimentional tolerance +/- 2% including watering for curing with sharp sweet sand from approved quarry & Portland cement of ISI standard and grade as approved by the Deptt.including all labour T&P cost,carriage,& L.W.Cess to Complete the item of work in all respect as per the direction of the Engineer-in-Charge Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) | 19.82 | One Cum | 5,703.8 | ₹1,13,049.32 |
| 5 | Cement Concrete M-20 Grade using 12mm. size down graded crusher broken hard granite good quality chips free from weathered skin and any other deleterious materials using screened and washed coarsed sand from approved quarry and Portland cement of ISI standard and grade as approved by the Deptt. including watering for curing for speficied days and all labour T&P cost,carriage,royality & L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-charge.Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) (Ground Floor) | 0.05 | One Cum | 8,123.9 | ₹406.2 |
| 6 | Rainforced Cement Concrete M-25 Grade using 20mm. size down graded crusher broken hard granite good quality chips free from weathered skin and any other deleterious materials using screened and washed coarsed sand from approved quarry and Portland cement of ISI standard and grade as approved by the Deptt. including watering for curing for speficied days and all labour T&P cost,carriage,royality & L.W.Cess to complete the item of work in all respect as per the direction of the Engineer-in-charge.Including Royality, E.M.F., D.M.F & Additional Royality (Excluding GST) (Ground Floor) | 46.6 | One Cum | 6,938 | ₹3,23,310.8 |
| 6.01 | 1St Floor | 22.9 | One Cum | 7,064.4 | ₹1,61,774.76 |
| 6.02 | 2nd Floor | 4.96 | One Cum | 7,209.7 | ₹35,760.11 |
| 7 | Rigid smooth centering & shuttering for Cement concrete works including false work and dismantling them after required days of casting including all cost labour T&P carriage & L.W.cess to complete the item of work in all respect as per the direction of the Engineer-in-charge. (Excluding GST)
(A) Coloumn base. | 74.51 | One Sqm | 250.5 | ₹18,664.76 |
| 7.01 | (B) Plinth Beam(Ground Floor) | 20.76 | One Sqm | 1,228.8 | ₹25,509.89 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
DTCN_6.pdf
Tender Documents • 4.83 MB
BOQ_620113.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .