Loading…
Loading…
287 results • Latest
S&T work in connection with 1) Construction of 2 Lane ROB in lieu of LC-6 at Km 12/2-3 on JHL-HSR section near Jamalpur Shaikhain. 2) Provision of one hook placement of half Goods rake at Goods siding at Bassi Pathana (BSPN) station of Ambala division. 3) Construction of 2 Nos LHS(5mx5m) by pushing in lieu of C-18 at Km 29/1-2 &LC -59 at Km 77/15-78/0 on JHL-HSR section. 4) Replacement of Girder with PSC slab & strengthening of substructure of Br.No.190, 197A-1, 220A, 232 DUI-JHL, Br.No.49, JHL-HSR, 30,82,135 LDH-DUI, Br.No 60-A, 100 RPJ-DUI, 221,292 DUI-BTI & 143 BTI-SGNR Section. 5) Provision of 3m FOB at Barwala (BXC)
Rehabilitation of Datalogger (DL) and fault analysis system (FAS) over Ambala division.
Provision of replacement of batteries, antenna etc of 5W walkie talkie; battery and surge arrester for 25 W VHF set in Kharagpur Division.
S&T work in connection with (1)Construction of RUB/ Subway for elimination of Manned level crossings AM-44 bet LYD-MLQ & PK-5 bet PRR-Ksx section by cut & cover method in Adra division.(2) Construction of RUB/ Subway for elimination of Manned level crossings 6 Nos AM-13, AM-18, AM-22, AM-42, MR-33 and MR-45 between ADA-GMO and KSK -RJB section in Adra division.
S&T work in connection with the Improvement of the yard under the jurisdiction of SSE(P.way)/PRR in Adra Division.
Providing Project Supervision Seryices Agency (PSSA) for the work of Survey, design, supply, installation, testing and commissioning of stationary KAVACH equipment and other associated works over the jurisdiction of Mumbai Division of Central Railway & Survey, design, supply, installation, testing and commissioning of TOWERs for Kavach and other associated works over Central Railway of Mumbai division