Loading…
Loading…
1,409 results • Latest
Telecom work in connection with AMRIT BHARAT STATION SCHEME:- PROVISION OF NEW STATION BUILDING ALONG WITH DRAINAGE SYSTEM IN CIRCULATING AREA AT HARISHCHANDERPUR RAILWAY STATION.
Provision of CCTV Surveillance system at six nos. of goods sheds (viz.- RDR, VAA, RUI, CRS, BQA (new) & BKEC) in Adra division.
Signalling work in connection with provision of second goods shed common running line of 750M at Phariya station of BSB division.
Provision of Railnet/IPDSLM at Haridwar and adjacent stations including laying of telecom cable for Kumbh Mela 2027
Comprehensive Annual Maintenance Contract of Siemens (Westrace Mark-II) Make Electronic Interlocking system installed at Batala (BAT) Station of Firozpur division for Three (03) Years.
Replacement/ Up-gradation of capacity of existing data Loggers and provision of data logger networking management room over Firozpur Division.
Alteration Work for Construction of 2 additional Loop Lines in DN grid of Maluka yard.
S&T works in connection with Construction of 2 additional Loop Lines in DN grid of Maluka yard.
Shifting of S&T cable in connection with construction of 4 lane elevated road from Patna Saheb Railway station to Patna Ghat /JP Ganga Path (BSRDCL), S&T work in connection with yard improvement and track renewal work in PNBE-DDU section under Danapur Division.
Signaling related work along with EI alteration in connection with common loop line facilities for DN line and TTM siding at Chandur station of Nagpur Division.
Signaling related work related to Engineering work at various locations at Warora and Nagpur Depot of Nagpur Division.
Augmentation of S&T assets by Provision by Electronic Interlocking at Reoti station to Enhance safety & reliability of signalling system with flexibility in Operation (Emergency Operations, Route release etc)
S&T work in connection with the construction of the subway at closed LC No. KA-61 at Km 199/25-27 between PBA-VSU to facilitate the movement of pedestrian and vehicular traffic in the Adra Division.
Provision of OFC Equipment for Control Communication in the section for Kumbh Mela 2027.
Provision of CCTV at all railway stations between LRJ-HW and HW-RKSH for Kumbh Mela 2027.
Comprehensive Annual Maintenance Contract (CAMC) of Integrated Power Supply System (IPS) (Statcon Energiaa make) for a period of 05 (Five) years installed at different stations in Kharagpur Division of South Eastern Railway.
Overhauling of Lever Frame of East Yard Cabin & West Yard Cabin in LDH Yard on Quotation basis.
Supply, Fabrication and Installation of Water roof Galvanized MAINCOVER ASSEMBLY for 20 No's point machines over the division on quotation basis.
S&T works for Provision of balance and additional work at Adityapur Station.
Alteration Work for Interlocking of 01 No. Non Interlocked Engineering L.C.Gate at Link-C - Dumetra Section.
Comprehensive Annual Maintenance Contract of Electronic Interlocking System (Siemensmake) installed at Santragachi Station for a period of three (03) years in Kharagpur Division.
Telecom work c/w Soft upgradation of Nanaksar Railway station on LDH-FZR section of Firozpur Division.
Associate signalling works in connection with provision of Track Machine Siding at KTX, JMRA, LLBR, SIBR, HLX, BHRB & JRBM station of Lumding Division.
Telecom facilities in c/w Improvement of Traffic Accounts Office at Jalandhar City.
Signal & Telecommunication work in connection with "Construction of extended loop in UP & DN direction at Yavat and Kedgaon station between Pune - Daund section".
Comprehensive Annual Maintenance Contract for Automatic Fire Detection and Alarm System (M/s. Ravel Make) for a period of Two(02) Years at 36 stations and 1 LC gate (total 42 unit) in Adra division.
Provision of Public Address System at HW & adjoining locations.
(A) S&T works in c/w Provision of Yard remodelling work in PRYJ end & HWH end at Chunar Jn. and (B) Provision of 02 rake handling capacity at a time in Chunar goods shed.
Sectional Telecom Maintenance Contract for 24 months in the section of Sr. DSTE/Kanpur.
S&T portion of work in connection to (1) Replacement of Integrated passenger information system (IPIS) at HIJ (PF No-1 &2) & KGP ( PF No- 7 & 8). (2) Comprehensive Annual Maintenance Contract (CAMC) of Double faced CGDB, Single line double faced Platform display board, Single faced Monocolor (AGDB) Three Line Train Arrival/Departure display board, Platform Data Controller (PDC) & Central Data Controller Unit (CDC) at HIJ (PF No-1 &2) & KGP (PF No- 7 & 8) in KGP Division of S.E.Railway.
Annual Maintenance Contract work of IPIS System (Coach Guidance Display Boards, Train Indication Display Boards etc.) of make IDDS at Hubballi Railway Station (PF-1,3,6,7,8, IIIrd Entry, and subway) for a period of Two Years
Provision of EI based Automatic Signalling in lieu of Relay based interlocking with Dual Detection by MSDAC and other Associated works along with suitable indoor alterations in Stations enroute AGC-RKM, BFP-RNKA & RNKA-KXM Automatic Sections of Agra Division of North Central Railway.
Replacement /Augmentation of old underground telephone cable(PIJF),OFC at Zonal HQ/BBS and provision of Fiber monitoring system of East Coast Railway.
Provision of an Indoor Video Wall at MYS Station for displaying all types of content, including videos, slides, train running status, PowerPoint presentations and live video streams.
Comprehensive Annual Repairing Contract (CARC) of Single Section Digital Axle Counter (SSDAC) and High Availability Single Section Digital Axle Counter (HASSDAC) (GG Tronics make) for a period of 03 (Three) years installed at different stations in Kharagpur Division of South Eastern Railway.
Comprehensive Annual Maintenance Contract of Kyosan make E.I. installed at PES, RFJ, MPO, KTQ, AUBR, GRRU, PRY, KSTA and 5 Auto Relay Hut between SEB-BHKH section of DDU Divn for Two years.
Comprehensive annual maintenance of Medha make Electronic Interlocking at 3 Stations as Bharwari (BRE), Rasulabad(RUB), Malwan (MWH) of Prayagraj division for a period of three years.
Comprehensive AMC of SMPS based IPS systems (Statcon Make) installed at Stations and relay huts / LSC Gate in SSL-PNK Section of Prayagraj Division for a period of Thirty Six Months.
Annual Zonal Contract of Signalling gears under the jurisdiction of ADSTE/KKDI in MDU Division for the period of Two Years (2026-2027),(2027-2028)
Reliability improvement by means of repairs, restoration/ maintenance of signaling assets under the jurisdiction of SSE/Sig/Hill/LMG/IC.
Reliability improvement by means of repairs, restoration/ maintenance of signaling assets under the jurisdiction of SSE/Sig/BPB/IC.
Provision of one full length stabling line at Nautanwa station and Brakevan reversal siding at Subhagpur station.
Improvement to passenger amenities at JKNI Halt station, Major improvement work like extension of PF no.2, water supply pipeline and sanitation & Provision of RCC OHT (50000 Gallon) with 01 no. deep tube well (900') etc. at SDDN in LJN Division, Major improvement work like raising of PF no.2, Existing PP shelter, Provision of RCC OHT (50000 Gallon) with 01 no. deep tube well (900'), Imp. of toilet water supply, pipeline and sanitation at BLP in LJN Division, Proposed dismantling & extension of existing foot over bridge from platform No. 02 to platform No. 01 at Lucknow City station of Lucknow Division, Development of Goods platform surface ,fencing etc. at PD & approach road widening etc. at BKT , S&T Work in connection with Provision of New PP Shelter at PF no. 2, 3, 4 & 5 due to existing infringement of SOD in old PP Shelter and providing galvanized sheet PF No. 1 & 6 of LJN Station in section of SSE/W/LJN. Provision of Telecom facilities for 2nd entry gate (South side) at SDDN in LJN Division. Improvement of platform surface on PF no. 1 to 6 with improvement of Concourse Area, Passenger Hall, waiting hall and water supply pipeline, Toilets and circulating area at LJN station.
LJN Division: Extension of P.P. Shelter at 18 Nos. of Different stations. Total-45 bays.
Signalling work in connection with SDAH Division -Provision of Track Machine Siding -12 Nos along with CTR(P) - 20.909 TKM & TRR(P) - 4.404 TKM , CTR(P)- 4.123, TRR(P)-27.395 TKM & TTR (FS+TWS+WCMSC)-3 Set (1 in 12) in Sealdah Division.
Comprehensive AMC of SMPS based IPS systems (STATCON make) installed at stations and Relay Huts/Gates in SrDSTE/Sig/PRYJ's Section of PRYJ Division for a period of Two years.
Interlocking of 05 Nos of L.C. Gate having more than 20000 TVU in various section under Danapur division.
S&T work in c/w (1) Repl. of steel girder with RCC slab of Bridge No.102 UP&DN, 111 UP&DN, 119 UP on JUC-ASR sec., B.no.180 on ASR-ATT & br. no.103 on VKA- DBNK section. (ii) Construction of LHS of internal size 5 m X 3.5 m LHS in lieu of LC C-7 at KM 4/13-14 on JUC-NRO section under ADEN-JUC over firozpur division. (iii) Construction of LHS of internal size 5.0 X 5.0m at manned L-xings No.A-5 on VKA- DBNK section by pushing method in the section under ADEN-I/ASR. (iv) Construction of RCC box (2 nos. twin boxes) bridge in lieu of steel trough bridge no.158 in PHR-LNK section.
Sectional Signal Maintenance Contract (SSMC) for the sections of DSTE/FZR for one year.
Associate signalling works in connection with BG Through turnout renewal (without sleepers) (Total-137 sets) in GHY- LMG and BG Through turnout renewal (with sleepers) (Total- 32 sets) in LMG- JMI section (Grand Total- 169 sets) under the jurisdiction of Sr.DEN/I/LMG.