Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹33.8 Cr
EMD Value
₹67.5 L
Closing Date
6 Nov 2026, 3:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
TENDER
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; whereV = Advertised value of the tender in crores of RupeesN = Number of years prescribed for completion of work for which bids have been invited.The average annual Contractual Turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited.Three similar works each costing not less than the amount equal to 30% of advertised value of the tender,ORTwo similar works each costing not less than the amount equal to 40% of advertised value of the tender,OROne similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Any signal interlocking works involving EI or RRI or PI or IBS or IBH or LC gate or yard modification or UFSBI or Track circuit (AFTC or DC TC) or Axle Counter (SSDAC or MSDAC or HA-SSDAC) or Automatic signalling"."
8 conditions · 4 needing a document upload
1. Earnest money deposit (scanned copy of the instrument to be attached) 2. Experience certificate (scanned copy of the credentials to be attached) 3. Turn over details (scanned copy of the attested certificates from the employer/ client, audited balance sheet duly certified by the chartered accountant etc., to be attached) 4. Details of strength of staff employed
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All works tenders or service tenders invited by railways through e-tendering on IREPS, having advertised value of Rs 10 lakh and above, contractors are eligible to take payment from Railways through a Letter of credit (LC) arrangement. (Ref: RB letter no.2018/CE-I/CT/9 dated 04.06.18) (i) For all the tenders having advertised cost of Rs 10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement. (ii) T h i s option of taking payment through L C arrangement h a s t o be exercised in !REPS (Indian Railway Electronic Procurement System - the e-application on which tenders are called by Railways) by the tenderer at the time of bidding itself, and the tenderer shall affirm having read over and agreed to the terms and conditions of the LC option.(iii) The option so exercised, shall be an integral part of the bidder's offer. (iv) T h e above option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract. (v) In case tenderer opts for payment through LC, necessary procedure for LC mode of payment shall be followed to deal release of payment through LC:
Shifting of S&T utilities in Turavur - Ambalapuzha section to facilitate Engineering works as part of Turavur - Mararikulam, Mararikulam - Alappuzha & Alappuzha - Ambalapuzha doubling works
ERS-SG-CN-06-2026~SR
ERS-SG-CN-06-2026
Open
Works - General
18 Months
Ernakulam, Kerala
₹0
₹67.5 L
14 Oct 2026
14 Oct 2026
23 Oct 2026
125 items across 3 schedules · ₹27,45,56,042.87 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Per Unit | 15.00 | — | 21,650.89 | 3,24,763.35 |
| 2 | Numbers | 20.00 | — | 28,118.51 | 5,62,370.2 |
| 3 | Numbers | 240.00 | — | 1,618.75 | 3,88,500 |
| 4 | Numbers | 240.00 | — | 1,707.55 | 4,09,812 |
| 5 | Location Box | 150.00 | — | 1,370.66 | 2,05,599 |
| 6 | Location Box | 50.00 | — | 846.75 | 42,337.5 |
| 7 | Numbers | 5.00 | — | 1,10,759.06 | 5,53,795.3 |
| 8 | Numbers | 5.00 | — | 31,873.7 | 1,59,368.5 |
| 9 | Numbers | 5.00 | — | 11,320 | 56,600 |
| 10 | Set | 5.00 | — | 59,000 | 2,95,000 |
| 11 | Set | 5.00 | — | 77,160.07 | 3,85,800.35 |
| 12 | Metre | 120000.00 | — | 126.32 | 1,51,58,400 |
| 13 | Numbers | 49.00 | — | 4,004.72 | 1,96,231.28 |
| 14 | Numbers | 52.00 | — | 4,761.16 | 2,47,580.32 |
| 15 | Numbers | 120.00 | — | 4,628.91 | 5,55,469.2 |
| 16 | Numbers | 40.00 | — | 20,060 | 8,02,400 |
| 17 | Numbers | 960.00 | — | 262.65 | 2,52,144 |
| 18 | cum | 200.00 | — | 9,361.46 | 18,72,292 |
| 19 | Metre | 1200.00 | — | 64.1 | 76,920 |
| 20 | Metre | 3400.00 | — | 32.05 | 1,08,970 |
| 21 | Metre | 2000.00 | — | 314.41 | 6,28,820 |
| 22 | Metre | 250.00 | — | 2,224.44 | 5,56,110 |
| 23 | Metre | 3000.00 | — | 385.45 | 11,56,350 |
| 24 | Metre | 1164.00 | — | 501.03 | 5,83,198.92 |
| 25 | Metre | 2324.00 | — | 208.54 | 4,84,646.96 |
| 26 | Metre | 292000.00 | — | 18.18 | 53,08,560 |
| 27 | Metre | 1200.00 | — | 15.4 | 18,480 |
| 28 | Metre | 3400.00 | — | 7.77 | 26,418 |
| 29 | Numbers | 960.00 | — | 123.35 | 1,18,416 |
| 30 | cum | 120.00 | — | 949.05 | 1,13,886 |
| 31 | Metre | 120000.00 | — | 23.43 | 28,11,600 |
| 32 | Numbers | 25.00 | — | 10,030 | 2,50,750 |
| 33 | Numbers | 74.00 | — | 8,850 | 6,54,900 |
| 34 | Numbers | 74.00 | — | 9,233.5 | 6,83,279 |
| 35 | Numbers | 74.00 | — | 4,737.7 | 3,50,589.8 |
| 36 | Numbers | 74.00 | — | 6,814.5 | 5,04,273 |
| 37 | Numbers | 74.00 | — | 5,494.5 | 4,06,593 |
| 38 | Numbers | 4.00 | — | 19,470 | 77,880 |
| 39 | Numbers | 16.00 | — | 16,874 | 2,69,984 |
| 40 | Numbers | 54.00 | — | 14,278 | 7,71,012 |
| 41 | Numbers | 90.00 | — | 2,742.03 | 2,46,782.7 |
| 42 | Numbers | 75.00 | — | 5,901.5 | 4,42,612.5 |
| 43 | Set | 20.00 | — | 4,945.51 | 98,910.2 |
| 44 | Set | 30.00 | — | 8,786.26 | 2,63,587.8 |
| 45 | Set | 20.00 | — | 11,355.02 | 2,27,100.4 |
| 46 | Set | 20.00 | — | 13,597.41 | 2,71,948.2 |
| 47 | Numbers | 5.00 | — | 40,700 | 2,03,500 |
| 48 | Numbers | 80.00 | — | 8,978.88 | 7,18,310.4 |
| 49 | Per Unit | 900.00 | — | 167.99 | 1,51,191 |
| 50 | Per Unit | 150.00 | — | 201.27 | 30,190.5 |
| 51 | Numbers | 5.00 | — | 6,818.18 | 34,090.9 |
| 52 | Per Relay | 300.00 | — | 1,045.76 | 3,13,728 |
| 53 | Metre | 2324.00 | — | 1,119.16 | 26,00,927.84 |
| 54 | Metre | 50000.00 | — | 46.15 | 23,07,500 |
| 55 | Numbers | 960.00 | — | 2,441.72 | 23,44,051.2 |
| 56 | Metre | 120000.00 | — | 60.93 | 73,11,600 |
| 57 | Numbers | 10980.00 | — | 61.44 | 6,74,611.2 |
| 58 | Numbers | 2020.00 | — | 93.02 | 1,87,900.4 |
| 59 | Numbers | 970.00 | — | 103.84 | 1,00,724.8 |
| 60 | Square Foot | 300.00 | — | 144.86 | 43,458 |
| 61 | Numbers | 20.00 | — | 2,442 | 48,840 |
| 62 | cum | 60.00 | — | 231.3 | 13,878 |
| 63 | Numbers | 74.00 | — | 9,213.28 | 6,81,782.72 |
| 64 | Numbers | 74.00 | — | 8,287.08 | 6,13,243.92 |
| 65 | Per Unit | 20.00 | — | 1,524.86 | 30,497.2 |
| 66 | Numbers | 23.00 | — | 4,793.81 | 1,10,257.63 |
| 67 | Numbers | 150.00 | — | 11,333.1 | 16,99,965 |
| 68 | Numbers | 50.00 | — | 8,787.04 | 4,39,352 |
| 69 | Numbers | 40.00 | — | 5,348.81 | 2,13,952.4 |
| 70 | Numbers | 40.00 | — | 3,545.06 | 1,41,802.4 |
| 71 | Per Unit | 12000.00 | — | 172.14 | 20,65,680 |
| 72 | Per Unit | 800.00 | — | 209.93 | 1,67,944 |
| 73 | Per Unit | 100.00 | — | 151.09 | 15,109 |
| 74 | Per Unit | 20.00 | — | 188.86 | 3,777.2 |
| 75 | Numbers | 10.00 | — | 1,182.15 | 11,821.5 |
| 76 | Numbers | 10.00 | — | 1,132.2 | 11,322 |
| 77 | Numbers | 16.00 | — | 3,322.6 | 53,161.6 |
| 78 | Numbers | 16.00 | — | 6,359.19 | 1,01,747.04 |
| 79 | Numbers | 16.00 | — | 8,351.55 | 1,33,624.8 |
| 80 | Numbers | 16.00 | — | 22,772.95 | 3,64,367.2 |
| 81 | Per IBH/LC/STN/Auto section | 16.00 | — | 12,056.36 | 1,92,901.76 |
| 82 | Set | 16.00 | — | 4,491.34 | 71,861.44 |
| 83 | Numbers | 16.00 | — | 5,445.94 | 87,135.04 |
| 84 | Numbers | 6.00 | — | 3,972.14 | 23,832.84 |
| 85 | Numbers | 6.00 | — | 5,398.39 | 32,390.34 |
| 86 | Metre | 120000.00 | — | 26.11 | 31,33,200 |
| 87 | Metre | 8760.00 | — | 42.46 | 3,71,949.6 |
| 88 | Rack | 10.00 | — | 1,977.19 | 19,771.9 |
| 89 | Numbers | 8.00 | — | 1,580.36 | 12,642.88 |
| 90 | Numbers | 300.00 | — | 235.47 | 70,641 |
| 91 | Numbers | 30.00 | — | 3,205.7 | 96,171 |
| 92 | Metre | 2000.00 | — | 5.84 | 11,680 |
| 93 | Numbers | 130.00 | — | 3,006.71 | 3,90,872.3 |
| 94 | Numbers | 74.00 | — | 3,083.03 | 2,28,144.22 |
| 95 | Set | 16.00 | — | 5,550 | 88,800 |
| 96 | Set | 5.00 | — | 5,395.99 | 26,979.95 |
| 97 | Numbers | 80.00 | — | 86.3 | 6,904 |
| 98 | Metre | 320.00 | — | 14.71 | 4,707.2 |
| 99 | Set | 16.00 | — | 9,557.1 | 1,52,913.6 |
| 100 | Set | 5.00 | — | 12,640.13 | 63,200.65 |
| 101 | Kilometre | 43.00 | — | 716.01 | 30,788.43 |
| 102 | Kilometre | 43.00 | — | 519.85 | 22,353.55 |
| 103 | Man-Days | 600.00 | — | 847.59 | 5,08,554 |
| 104 | Man-Days | 300.00 | — | 1,073.45 | 3,22,035 |
| 105 | MT-Km | 10000.00 | — | 22.75 | 2,27,500 |
| 106 | MT-Km | 40000.00 | — | 13.91 | 5,56,400 |
| 107 | Hour | 120.00 | — | 1,202.5 | 1,44,300 |
| Schedule total | ₹7,08,23,582.03 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Shf-TUVR-AMPAsec-2VolumeIPartII_1.pdf
ATTACHMENT
Shf-TUVR-AMPAsec-3VolumeIICh-ISCC_1.pdf
ATTACHMENT
Shf-TUVR-AMPAsec-4VolumeIICh-IIPVC_1.pdf
ATTACHMENT
5 Volume II Ch III
ATTACHMENT
GCCApril2022_2.pdf
ATTACHMENT
GCCcorrectionslipsupto12_compressed1.pdf
ATTACHMENT
Shf-TUVR-AMPAsec-1VolumeIPartI_1.pdf
ATTACHMENT
AnnxVclarification14052024_3.pdf
ATTACHMENT
Policeverificationletter_compressed1_2.pdf
ATTACHMENT
Shf-TUVR-AMPAsec-5VolumeIIChIIISpecifications_of_Signaling_Works_compressed_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .