Loading…
Loading…
1,409 results • Latest
Provision of Essential Spare parts and items related to interlocked gate in DHN Division.
Interlocking of LC Gate Nos. 6 and 1C in Nagpur division (LC Gate No.6 at KM 864/1-2 between WANI-KAYAR and LC Gate No.1C at KM 759/32-34 between WARDHA-CHITODA JN)
Signaling related work in connection with Track Machine siding at Bordhai station of Nagpur Division.
Signalling work in connection with provision of second goods shed common running line of 750M at Phariya station of BSB division.
Bright Annealing of Magnetic components of Relays and Polarised Relay under controlled hydrogen atmosphere at Machine Shop, S&T/WS/PTJ for the period of Two Years -Qty-49000 Kgs.
Signaling and Telecommunication work for (1) New Electronic Interlocking (Centralized type) at KURKANAR and PALLI station for Jagdalpur-Rawghat new BG line along with yard remodelling at Jagdalpur station for new line connectivity of Raipur and Sambalpur Division. (2) Closure of manned LC no. AR-12 at Rajim Station and RD-22 at Kendri Station with the modification of existing EI at Rajim and Kendri station (3) Modification of Route Relay Interlocking (RRI) at Raipur Store Depot (RSD) station for Yard remodelling for coaching fitness in Raipur Division of South East Central Railway.
Comprehensive Annual Maintenance Contract (CAMC) for Integrated Power Supply (IPS) of M/s Amara Raja power systems Ltd. make for Two Years on Jabalpur Division of West Central Railway.
Enhancing safety by replacing defective/ worn-out TLJBs, Track leads, point insulations, ground connections, Location boxes & foundations, Signal assemblies & foundations including trenching, laying of cables, terminations etc in the section of DSTE/ Tele & Works on Kota Division.
Signaling work in connection with interlocking of Level Crossing Gate no. 30, 31, 40 and 42A in East section of Mumbai Division.
Signaling related work in connection with Track Machine siding at Bhandak station of Nagpur Division.
Signaling related work along with EI alteration in connection with common loop line facilities for DN line and TTM siding at Chandur station of Nagpur Division.
Signaling work in connection with fencing work in DIWA - PANVEL - ROHA & CSMT - PNVL, TNA (excl.) - Vashi (incl.) Harbour line of Mumbai division.
Asansol Division: Signalling work in connection with the works (i) ASN-03 Sitarampur Yard Improvement and Upgradation of different yards under Sr. DEN/1. (ii) ASN-05 Yard Improvement and Upgradation under Sr. DEN/2 (iii) ASN-04 Yard Improvement and Upgradation of different yards under Sr. DEN/3 (iv) ASN 02 Yard Improvement and Upgradation for Asansol Yard using Axle counter and other signaling work.
Asansol Division: Replacement of equipment of interlocked LC Gates on age cum condition basis & reliability improvement.
Upgradation of Audio/ Visual system of Auditorium at HQ Hajipur.
Proposed construction of RUB at LC no 286 at Km 474/000-474/100 in between UNK-BDKA section
Telecom: 1.Telecom arrangements in connection with rehabilitation of station building at Godumgura(GDQ ) station in Sr.DEN/West juridiction. 2.Telecom arrangements in connection with rehabilitation of station building at Chitigidda(CTF) station in Sr.DEN/West juridiction. 3. Raising of PF 1 & PF 2 from Rail level to High level, Provision of COP and passenger amenities at Chitgidda station under Sr.DEN/West/SC Juridiction. 4. SEM Station:Proposed Raising of Platform No.2 to High level at Seram station. 5. SKP Station: Raising of PF.1 & 2 to HL ,Provision of COP,Pathway & passenger amenities at SKP. 6. Telecom arrangements in connection with Br.N0 191 at km 166/1-2 rebuilding with RCC box. 7.SC Division :Telecom arrangement in connection with Upgradation of COP by providing SS gutters and new sheeting to arrest leakages at stations under Sr.DEN/West/SC jurisdiction. (SKP,NPL,LPI,CDNR,BRBD,BTNR,SEM,MQR,CT). 8. Telecom arrangements in connection with Construction of female block of new running room at KZJ for resting of running staff. 9.Provision of addl. COPs and upgradation of existing COPs and Upgradation of Existing COP's with new sheeting & gutter in DEN/Central jurisdiction.( upgradation of existing COPs at GNP,ALER,WP,BN,MLY and upgradation of existing COP with new sheeting & Gutter at GNP,RGP,ALER,BN,MLY stations) 10..Upgradation of COA systems at 22 locations over SC division and Provision of COA at new locations Ghatkesar,Sanathnagar,Telapur,Ramchandrapuram stations. Signal: 1. Signalling arrangement in connection with Rehabilitation of STATION MASTER room at CHITTIGIDDA (CTF) Station. 2. Signalling arrangement in connection with Rehabilitation of STATION MASTER room at GODAMGURA (GDQ) Station. 3. Signalling arrangements for proposed raising of PF 1 & PF 2 from Rail level to High level, Provision of COP and passenger amenities at Chitgidda station unde
Telecom Work in connection with Provision of RPF Barrack (30 Beds) including Kitchen, Lat/Bath, Recreation hall, Dining hall etc. at KNE.
Up gradation of Single SSDAC / HASSDAC of G. G. Tronics make from Ver S002 to Ver S003 as per RDSO guidelines in Katihar Division
S&T associated work for various engineering works (TTR/TWS/TRR/TSR) in the Jurisdiction of SSE/Sig/BNW over Bikaner Division
"S&T associated work for Removal of PSR in SDLP-BKN (34 Nos.) section over Bikaner Division
Signalling workin connnection with Thane - Extension of PF Nos. 5 & 6 for handling of 24 LHB Coach Trains.
Signalling work in connection with CSMT - Kalyan - Improvement of Track Alignment by Track Slewing and OHE modification in Mumbai Division.
Asansol Division: Extension of UP and DN Loop Lines at Kalubathan Station Yard.
Addition & alteration in existing Electronic Interlocking system (Medha Make) at Jaunpur station in connection with Chord Line work between Muftiganj-Mahgawan bypassing Jaunpur station and indoor & outdoor signalling works in connection with closure of LC-40 in CPB-MGW section of Lucknow Division.
S&T Work in connection with the improvement of the yard under the jurisdiction of SSE(P.way)/BKSC in Adra Division.
Repair & Comprehensive Annual Maintenance Contract (CAMC) of IPIS Integrated Passenger Information System installed at Unnao (ON) and Varanasi (BSB) Railway Station (Make: Partronics) for Three years over Lucknow Division of Northern Railway.
Rajkot Division-Signalling work in connection with Engg work of (i)TTR(TWS+WCMSC) 21 sets (ii)RJT-OKHA- CTR(P)-4.190 Tkm & TRR(P)-25.155Tkm (iii)JAM-KNLS Section: CTR(P) From Kms.848.886 to 850.700 Total 1.814 Kms (iv)Viramgam - Rajkot, Wankaner - Navlakhi & Surendranagar - Botad- CTR(P)- 4.013 Tkm, TRR(P)-8.982 Tkm and TSR(P)-50.74 Tkm(v) Kanalus: Rectification of bad layout from Pt 112 towards PBR side by shifting the turnout manually by 18m towards RJT.
Provision/Upgradation of Infrastructure facilities, Monitoring Mechanism, FOIS/TMS at Six Goods Shed over MB Division (RMU, AMRO, BSC, HPU, HRI & ROZA).
Supply, Installation, Testing & Commissioning of MSDAC, Alteration/Modification in Electronic Interlocking and associated works in connection with Provision of dual detection at vulnerable location of Mathura Junction Station of Agra Division of North Central Railway.
Provision of outsourcing of gangs (manpower) for Engineering machine and other engineering-associated block works.
Provision/Upgradation of Infrastructures at Eight Goods Shed over MB Division (SEO, AWP, DPR, BJO, DUB, IQB, RK, BEK).
Railnet Connectivity at Major Station, depot,stores over Moradabad Division .
Provision of Railnet/IPDSLM at Haridwar and adjacent stations including laying of telecom cable for Kumbh Mela 2027
Comprehensive Annual Maintenance contract of Eldyne Make (Multi Section Digital Axle Counter) MSDAC over Moradabad Division for Three Years.
Provision of CCTV cameras at 10nos. manned Non-Interlocked LC gates of Pune division, Central Railway.
TELECOM WORKS IN CONNECTION WITH "(1) Pratapnagar: Construction/Improvement of Office building and other infrastructures. (2) Pratapnagar: Construction of 4 units Type-V quarters on replacement account of Qrt No. 1, 6, 14 & 15. (3) Ektanagar: Construction of New ORH at. (4) Pratapnagar: Provision of Office/Service building on replacement account for Hospital building, Community Hall, DRM Office campus, etc. at (Excluding Community Hall). (5) Pratapnagar: Construction/Improvement of Service building, etc. and other associated works under the jurisdiction of SSE(W)PRTN. (6) Pratapnagar: Replacement of one block of DRM building (G+2) and creation of related building complex. (7) Pratapnagar: Augmentation of Account and Store Section at First Floor in New DRM Office building.
Provision of MSDAC in addition to existing track circuit at Gorakhpur Cant (GKC) station over Lucknow Division.
Upgradation and interlocking of Manned Non-Interlocked LC Gate No. 31E in LKPR- NCP Section & 57E in BNJ-PTPL Section of Sealdah Division.
(A) Signalling work for Construction of ROB in lieu of LC-415-A at Km 1313/0-1 and (B) Construction of Grade separator with stair (FOB) at LC no. 34L at KM 1348/31-33 in NYN-MKP section of Prayagraj Division.
S&T works in c/w - 'Replacement of severely deteriorated Relay Hut (RH-2) between NYN-PRYJ including indoor S&T installations.'
(A) S&T work for Replacement of old FOB by new FOB at Sirathu (SRO) Railway station of Prayagraj Division. (B) Signalling work for Construction of RUB in lieu of Level Crossing No. 13 at KM 836/6-8 in Bharwari Station Yard of PRYJ-CNB section.
Provision of Rat & rodent repellent over Signalling installation.
Alteration Work for Interlocking of 01 No. Non Interlocked Engineering L.C.Gate at Link-C - Dumetra Section.
Proposed painting of Left-over signaling assets over MDU division
S&T work for Interlocking of 01 No. Non Interlocked Engineering L.C.Gate at Rourkela-Kuarmunda (Km. 419/ 13B-14B).
Telecom work in connection with AMRIT BHARAT STATION SCHEME:- PROVISION OF NEW STATION BUILDING ALONG WITH DRAINAGE SYSTEM IN CIRCULATING AREA AT HARISHCHANDERPUR RAILWAY STATION.
S&T work for Interlocking of 01 No. Non Interlocked Engineering L.C.Gate at Link-C - Dumetra (Km. 409/ 6-8).
Replacement of Signal posts, Batteries, Mechanical gadgets, Replacement of over aged defective cables and other reliability improvements works at LC gates in TVC Division.
Signalling work in connection with KAVACH Tower shifting involving dismantling of existing, survey of new tower, RSSI Survey, New tower Supply, erection & painting, etc. works in connection with the work of "Vadodara-Geratpur Section: elimination of Level X-ing No. 294 between Nenpur-Kanij at Km 471/16-18 by Providing Two Lanes Road Over Bridge (ROB) (IRPSM ID - 15.06.30.21.1.55.006)