Expenditure
Capital (Works)
WORKS
19 conditions · 7 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway.
Note for Technical Eligibility Criteria: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Definition of Single Similar Work: Any signalling work with the following Special conditions.
a. Submission of 'Undertaking by the tenderer' that the equipment shall be procured from RDSO approved sources and installation, testing and commissioning of equipment shall also be got done from the same source including after sales support required during the warranty period.
b. After the award of the contract, MOU with RDSO approved source covering supply, installation, testing and commissioning of equipment by the same RDSO approved source including after sales support required during the warranty period, before supply of equipments is undertaken.
c. In the MoU, original equipment manufacturer shall: i) Offer technical support for supply, installation and commissioning of the equipment. ii) Undertake certification of Factory Acceptance Test. iii) Undertake verification and certification of pre commissioning checklist as per RDSO guidelines. iv) Sign on the Application for Technical System approval by RDSO wherever applicable to ensure that the installation is as per the 1.1.4 RDSO stipulations. v) Impart training to Railway officials at their factory premises and at site.vi) Offer Warranty for equipment as per the condition laid in the tender document and RDSO specification for a period of one year from the date of commissioning. vii) Guarantee to supply spares for a minimum period of 7 years after the expiry of the warranty period. viii) Support Railways for entering into AMC/ARC if any on later date after the expiry of warranty period.
d. The appropriate level of satisfactory performance certificate shall be 1.1.5 obtained from Indian Railways/RVNL/IRCON/CORE/RI TES is from JA Grade officer in Indian Railways or equivalent.
27 conditions · 3 needing a document upload
All the tenderers/Contractors have to deposit full Bid Security and tender document cost as stipulated for the tender, through online modes as permitted in IREPS application through multiple banks net banking, debit and credit cards . All documents related to Partnership deed/Joint venture/ Consortium/ MOU, duly signed by the notary public, should be uploaded failing which offer will be summarily rejected.
Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modifications, as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work.
I/We also hereby agree to abide by the Indian Railways Standard General Conditions Of Contract for works 2022, with all correction slips up-to-date and to carry out the work according to the Special Conditions of Contract and Specifications of materials and works as laid down by Railway in the annexed Special Conditions/Specifications, Schedule of Rates with all correction slips up to date for the present contract
I/We offer to do the work for DRM/S&T/TVC, at the rates quoted in the attached schedule and hereby bind myself/ourselves to complete the work in all respects within the period of completion stipulated in the tender document, from the date of issue of letter of acceptance of the tender. The amount as stipulated in the tender document is herewith forwarded as Bid Security. Full value of the bid security shall stand forfeited without prejudice to any other right or remedies in case my/our Tender is accepted and if : (a) I/We do not execute the contract documents as stipulated in performance guarantee clause of GCC for works 2022 as detailed in general instructions. (b) I/We do not commence the work within seven days after receipt of orders to that effect.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking
However, Railways shall have the right to incorporate any such condition quoted by us, in the contract, at their discretion, if contract is placed on us.
Manual submission of Bid Security and cost of tender form cannot be entertained/Considered and hence no need of uploading the scanned copy of financial instruments
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association Board resolution, failing which tender shall be summarily rejected. The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association Board resolution, failing which tender shall be summarily rejected. A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Appostille certificate.
INSTRUCTIONS TO TENDERERS
The tenderer shall thoroughly go through the entire tender documents and strictly adhere the instructions and directions given at different pages.
Tender Document Cost for this work is Nil.
Unreleased Bid Security, if any, held with the Railway Administration, shall not be adjusted towards the Bid security to be remitted.
If the Tenderer(s) deliberately give(s) wrong information/ incorrect documents in his/their tender or create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage. The entire Bid Security and any other dues available with Railway against that contract will be forfeited. Action will be taken to suspend the business with the tenderer for a period of two years. In addition, Administration reserves the right to prosecute under suitable law.
All terms and conditions in the tender documents are binding on the Tenderers.
Railways reserves the right to accept or reject any or all the tenders and to award the work in whole or in part without assigning the reason for any such action.
The Tenderers are advised to visit the site of work in their own interest and acquaint themselves with the site conditions and expected quantum of work and assess all the site specific difficulties to be experienced while executing the same and the rate shall be arrived duly considering all the facts above and quoted in the tender. Any representation at a later date specifying the site difficulties shall not be considered.
The bidder has to fill in his quoted rate against each item in the Bid rate / Unit rate column. If the bidding unit is Above/ Below/ Par, the bidder can select the %Above, %Below or %At Par option from the drop down list in the same column. If the bidding rate is Rs. or Rs./ unit, the bidder has to quote his rate for the item group or individual item accordingly
All the bidders/tenders should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law
In case of any wrong information submitted by tenderer, the contract shall be terminated, Bid security, Performance Guarantee(PG) and Security Deposit(SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 2(Two) years
Replacement of old version IPS at CHPD , CNGR , TVCS, NYY , PASA and KZT stations in TVC Division.
TVC-SNT-SIG-26-27-14~SR
TVC-SNT-SIG-26-27-14
Open
Works - General
6 Months
Thiruvananthapuram, Kerala
₹0
₹3.0 L
16 Sept 2026
16 Sept 2026
24 Sept 2026
20 items across 1 schedule · ₹1,22,69,193.42 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | "Submission of all relevent final 'As mades' of circuit diagrams, contact analysis charts, termination particulars of apparatus cases and cable termination rack, power supply arrangements, relay index board, cable plans, cable route plans, red boundary plans and all other particulars covered under various schedules. All 'As mades' shall be prepared by the Contractor in AUTOCAD 2000 or latest and submitted in CDs. One copy of the 'As mades' check print shall be submitted before Testing the circuits. The final negatives shall be made in tracing sheet (80 to 90 gsm). All 'As mades' except cable plan, cable route plan, bonding diagram & power supply diagram shall be prepared in A3 size. On approval the contractor shall submit along with the negatives, 8 copies in each, duly making booklet neatly bound. Out of 8 sets, 2 sets of drawings and other plans shall be kept in transparent plastic cover (2 sheets back to back in one plastic cover) and handed over to Railways. Also the contractor has to supply one set of As mades in 'Reproduction Film'. The approved circuit diagram will be issued by Railways in soft copy as well as two sets of hard copies. Wherever alterations to existing circuits are involved, the existing as-made circuit diagrams will be supplied by Railways either in CDs or RP film. The Contractor shall incoporate the details of all the new wirings and alterations in the CD/ RP film and submit them to Railways. Onapproval 8 copies shall be made for As-made circuit diagrams also as mentioned above" | Sheet | 30.00 | 382.12 | 11,463.6 |
| 2 | Wiring o f Relay Inputs t o Wago Block and Wago block to Datalogger. Necessary Wagos required is included as per schedule | Per Unit | 90.00 | 285.86 | 25,727.4 |
| 3 | Wiring of Analog Voltages from IPS Room to Datalogger. Necessary Wa g o s required is included as per schedule | Numbers | 120.00 | 285.86 | 34,303.2 |
| 4 | Supply a n d Provision o f Earthing a s per R DSO Specification RDSO/SPN/197/2008 or l a t e s t ( a s p e r Te c h n i c a l Specification enclosed) | Numbers | 6.00 | 28,118.51 | 1,68,711.06 |
| 5 | Supply of IPS to suit 4 Line RE station as per RDSO Specifications RDSO/SPN/165 or latest, (This schedule does not include Batteries) As per drawing enclosed | Numbers | 3.00 | 12,76,951.75 | 38,30,855.25 |
| 6 | Supply of IPS to suit 6 Line RE station as per RDSO Specifications RDSO/SPN/165 or latest (This schedule does not include Batteries) As per drawing enclosed | Set | 3.00 | 13,07,398.11 | 39,22,194.33 |
| 7 | Supply o f Low maintenance secondary cells o f t h e following capacities w i t h necessary inspection a s p e r specification/ drawing/ description enclosed in this document.d)Supply o f Secondary cells - 2V- 200AH capacity | Numbers | 180.00 | 7,040 | 12,67,200 |
| 8 | Supply o f Low maintenance secondary cells o f t h e following capacities w i t h necessary inspection a s p e r specification/ drawing/ description enclosed in this document. e) S u p p l y o f Secondary c e l l s - 2V-300AH capacity | Numbers | 180.00 | 9,574 | 17,23,320 |
| 9 | Commissioning of IPS, this schedule includes arrangement o f O E M engineer f o r checking the Installation and carrying out adjustments o f I P S m odule s a n d submission o f Pre- commissioning checklist | Set | 6.00 | 59,000 | 3,54,000 |
| 10 | Installation, wiring and testing of IPS as per RDSO Specification No. RDSO /SPN /165 or latest.This work includes transporting the IPS from the Stores by loading without any damages and installation of the same at site. This also includes wiring of all modules, proper earthing of equipments and all other w o r k s c o n n e c t e d f o r t e s t i n g and commissioning o f t h e s a m e . Necessary p o w d e r e d c o a t e d A l u m i n i u m ladder arrangements including cable trench, pipes, bolts, a n d other accessories i s included in this schedule.[Earthing is not covered under this schedule] | Set | 6.00 | 77,160.07 | 4,62,960.42 |
| 11 | S u p p l y o f p o w d e r c o a t e d F T O T o f 210 capacity | Numbers | 4.00 | 41,627.08 | 1,66,508.32 |
| 12 | Concreting and erection of cable termination r a c k 500/210/140 Terminals capacity on teakwood base frame of size 50mmx150mm of suitable length and width with rectangular slot in the centre for taking in the cables and painting as per standard practice.(Supply of cable termination racks a r e not included in this schedule).[Foundation b o l t s a n d nuts with washers, cement, sand, stone jelly, teak wood base frame 50mmx150mm of suitable length and breadth, paint, varnish a n d all other miscellaneous materials required for the work shall be supplied by the contractor]. a)Concreting and erection of cable termination rack 140/210 capacity | Numbers | 4.00 | 9,752.74 | 39,010.96 |
| 13 | Fixing of PBT terminal block/ PBT fuse block, rubber grommets, clamping of cables using teakwood cable clamps a n d base planks, termination o f cables, provision of ND type f u s e s o f required capacities, provision of copper bus bar for supply terminals, wiring, provision o f termination particulars diagram board using plywood of thickness 1 2 m m - teakwood finish of size 1800mm x 1200mm w ith Aluminium grooved channel frame in the relay room. The blank spaces over the top of the cable termination rac k shall be covered with phynolic s h e e t o f thickness 3 m m wherever required. T h e termination and cable core particulars shall b e painted o n t h e PVC/ nylon sleeves. T h e w o r k also includes identification of cables using aluminium tags provided on each cable with letters punched neatly.(Supply o f PBT terminal blocks 25mm & 60mm centers and P B T F u s e b l o c k s i s not covered in the schedule) [Wire P V C 3 / 0 . 7 5 m m copper, brass bolts and nuts and washers, for fixing PBT terminal/Fuse Block, other fixing bolts and nuts, rubber grommets, PVC/ Nylon sleeves, copper bus bars, teakwood 50mm x 50mm for cable clamps, 25mmx 100mm for base planks, phynolic sheet 6 m m thick of size 1200mm x 1800mm with aluminium grooved channel frame, phynolic sheet 3mm thick, paint a n d a l l o t h e r miscellaneous materials shall be supplied by the Contractor]. a)Fixing of PBT terminal blocks (25mm/60mm centre) and termination (Per Unit = Per Terminal Block) | Per Unit | 180.00 | 167.99 | 30,238.2 |
| 14 | Fixing of PBT terminal block/ PBT fuse block, rubber grommets, clamping of cables using teakwood cable clamps a n d base planks, termination o f cables, provision of ND type f u s e s o f required capacities, provision of copper bus bar for supply terminals, wiring, provision o f termination particulars diagram board using plywood of thickness 1 2 m m - teakwood finish of size 1800mm x 1200mm w ith Aluminium grooved channel frame in the relay room. The blank spaces over the top of the cable termination rac k shall be covered with phynolic s h e e t o f thickness 3 m m wherever required. T h e termination and cable core particulars shall b e painted o n t h e PVC/ nylon sleeves. T h e w o r k also includes identification of cables using aluminium tags provided on each cable with letters punched neatly.(Supply o f PBT terminal blocks 25mm & 60mm centers and P B T F u s e b l o c k s i s not covered in the schedule) [Wire P V C 3 / 0 . 7 5 m m copper, brass bolts and nuts and washers, for fixing PBT terminal/Fuse Block, other fixing bolts and nuts, rubber grommets, PVC/ Nylon sleeves, copper bus bars, teakwood 50mm x 50mm for cable clamps, 25mmx 100mm for base planks, phynolic sheet 6 m m thick of size 1200mm x 1800mm with aluminium grooved channel frame, phynolic sheet 3mm thick, paint a n d a l l o t h e r miscellaneous materials shall be supplied by the Contractor]. b)Termination using P B T fuse block i n cable termination rack (Per Unit = Per Fuse Block) | Per Unit | 156.00 | 201.27 | 31,398.12 |
| 15 | S u p p l y o f P B T terminals 2 5 m m / 60mm centre and PBT Fuse blocks with necessary inspection a s p e r specification/ drawing/ description enclosed in this document. b)Supply of PBT terminals 60mm centre. | Numbers | 180.00 | 93.02 | 16,743.6 |
| 16 | S u p p l y o f P B T terminals 2 5 m m / 60mm centre and PBT Fuse blocks with necessary inspection a s p e r specification/ drawing/ description enclosed in this document. c)Supply of PBT fuse block without ND fuse | Numbers | 156.00 | 103.84 | 16,199.04 |
| 17 | Supply of ND Fuse of various capacities (Per unit=Per fuse) | Per Unit | 156.00 | 37.74 | 5,887.44 |
| 18 | Releasing of all power equipments including equipment stands, terminal boards, power p a n e l e t c . , i n t h e p o w e r r o o m carefully w i t h o u t c a u s i n g a n y d a m a g e t o the equipments a f t e r disconnecting a l l the supply wires. The released equipments shall b e accounted a n d stacked a t a p l a c e as instructed by Railway representative at site. After releasing any holes in the walls/flooring s h a l l b e fi l l e d w i t h c e m e n t mortar and plastered. | Set | 6.00 | 12,640.13 | 75,840.78 |
| 19 | Protection adjustments a n d re-instating of S & T gears by deputation of Helpers/Unskilled Labour for executing additional S & T portion o f t h e works. The w o r k can involve fixing, releasing, dismantling, replacement,excavation, clearing of vegetation, loading and unloadingof material and assisting skilled persons etc as per instruction of Railway representative. | Man- Days | 30.00 | 847.59 | 25,427.7 |
| 20 | Transportation o f Signalling materials more than 100km | MT-Km | 4400.00 | 13.91 | 61,204 |
| Schedule total | ₹1,22,69,193.42 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC2022.pdf
ATTACHMENT
GCCCorrectionslip1-5.pdf
ATTACHMENT
GCCCorrectionslip6-11.pdf
ATTACHMENT
SOR2022BOOKLET.pdf
ATTACHMENT
LetterPoliceVerification.pdf
ATTACHMENT
CableCutpenaltyLetter.pdf
ATTACHMENT
ModelformofBankGuarantee.pdf Model form of Bank Guarantee
ATTACHMENT
ATC_1.pdf
ATTACHMENT
ModelformofBankGuarantee.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .