Loading…
Loading…
836 results • Recent activity
FABRICATION AND ERECTION OF HUT TYPE STRUCTURE FOR MOUNTING OF 5 MT ELECTRIC CHAIN HOIST FOR SAFE LOADING AND UNLOADING OF SMALL/MEDIUM DAMAGED/REPAIRED TRANSFORMER IN BAREILLY, BUDAUN AND SHAHJAHANPUR WORKSHOP UNDER EWD-BAREILLY.
Modification of old and small oven (Heating Chamber) by dismantling to 24 KW oven (Heating Chamber) with double decker Trolley at Electricity Transformer Repairing Workshop Gonda and Bahraich under EWD-Gonda
Fabrication and Erection of Single Decker Trolley of Heating Chamber Electricity Transformer Repairing Workshop Sohawal, Akbarpur, Sultanpur and Gauriganj under EWD - Ayodhya.
FABRICATION AND ERECTION OF HUT TYPE STRUCTURE FOR MOUNTING OF 5 MT ELECTRIC CHAIN HOIST FOR SAFE LOADING AND UNLOADING OF SMALL/MEDIUM DAMAGED/REPAIRED TRANSFORMER IN AKBARPUR, GAURIGANJ, BARABANKI, SULTANPUR AND SOHAWAL WORKSHOP UNDER EWD-AYODHYA.
Fabrication and erection of structure by R.S. joist and channel and mounting of 3 MT electric chain hoist with trolley for safe loading and unloading of core coil assembly in front of the oven at Sohawal, Akbarpur, Barabanki, Gouriganj and Sultanpur
Supply of A-4 Size Paper (75 G.S.M.) for Electricity Workshop Circle, E.U.W.D, LESA office and Sub divisional office