Loading…
Loading…
4 results • Recent activity
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF INSTRUMENTS FOR RIHAND AND OBRA DAM IN SONEBHADRA DISTRICT UNDER THE DAM REHABILITATION WORKS IN LINE WITH DSRP RECOMMENDATIONS
FOR EXTRACTION OF ENERGY FROM DISCHARGE COOLING WATER CHANNEL OF ANPARA POWER PLANT BY DESIGN INSTALLATION AND COMMISSIONING ALONGWITH OPERATION AND MAINTENANCE OF HYDRO TURBINE SURFACE KINETIC HYDRO TURBINE OR ANY OTHER DEVICE
Selection Of Developer for Renovation Operation Maintenance and Transfer on right to use basis of Small Hydro Power Plants at Upper Ganga Canal UP
Request for selection of Developer for setting up of minimum 640 MW Pumped Hydro Storage Plant PSP by using upper reservoir at Rihand dam and lower reservoir at Obra Dam at Distt Sonebhadra UP on TBCB basis