Loading…
Loading…
16 results • Recent activity
Design (Through reverse Engineering), Manufacture, Shop Assembly Testing Before Dispatch, Packing and Forwarding, Transportation, Insurance, Handling, Delivery of 12 nos. Generator Stator Air Coolers for (3x42 MW) Larji HEP, Thalout Distt. Mandi HP
Annual maintenance of 30MW Unit No.I of Giri Power House under Giri Power House Division, HPSEBL, Girinagar Distt. Sirmour H.P.
Refurbishment/repair of the damaged rotor poles joint of Unit-III of 3x42MW Larji Power House under Resident Engineer Larji Power House Division HPSEBL, Thalout(H.P.)
Providing tungsten carbide hard coating by HP HVOF coating method on runner buckets ,major repair, surface finishing by means of grinding and grit blasting of fully forged pelton runner having 22 buckets for Bhaba HEP