Loading…
Loading…
203 results • Recent activity
Premonsoon Clearance by removing of water hyacinth /water weeds/bushes/jungles in between Ch.0.00 to Ch.125.00 of Dy-28R of TSMC(S) under Kangsabati Canals Sub-Division -XV under Kangsabati Canals Division No.-IV .
Maintenance of Canal T.S.M.C.(S)(in between Ch. 884.00 and Ch.1016.00) including removal of deposited earth and clearance of jungles at G.P.- Gopali,Block-Kharagpur-I Dist.- PaschimMedinipur under K.C. Sub Division No. XV, Kharagpur Under K. C. Di
Repair of Slip Subsidence erosion of Inspection path along the Left Bank in between Ch.64.00 and Ch 345.00 of Dy.33R of working length 8.56 Km in Block and PS- Salbani, District- PaschimMedinipur under KC Sub-Division.-XIV ofK.C.Division.-IV.
Pre-monsoon clearance of Tarafeni South Main Canal(South) by removing Water Hyacinth/ water weeds/ bushes/ jungles in between Ch. 1018.00 to Ch. 1048.00 of TSMC(S) of Kangsabati Canals Sub-Division- XV under Kangsabati Canals Division No-IV
M/R to C.C. Lining of left bank in between Ch. 833.00 to Ch. Ch.838.00 of MBC and refurbishment of old damaged boulder pitching in between Ch. 838.00 Ch. 841.50 of MBC at different stretches under Mouza Lakshmanpur Patharpara, Block-Salbani,
Supply and installation of conference table, chairs and storage cabinet at conference room of Chief Engineer (south-west) in connection with the work Renovation of Conference Room at Office of the Chief Engineer (South-West) at Abas, Khasjungle