Loading
Loading…
Loading…
5 results • Recent activity
GENERAL-Construction of Gabion wall at Valacode and Thenmala in NH 744-Gabion Walls at 45/900 (LHS) and 65/530 (RHS)-General Civil Work
Earth work excavation for Retaining wall in ordinary soil up to 3m height with manual Means PCC 136 PCC M15 Substructure
pave rubble at the base to get a level surface and then provide an RCC top layer to prevent erosion and scouring. Construction of concrete skirting up to a height of 125cm is also proposed
extension of the culvert at KM 3 400 and construction of U drain and Traffic Safety Items
Earthwork Excavation PCC M15 HYSD bars PVC weep holes Dowel Bars GSB