Loading…
Loading…
69 results • Recent activity
GENERAL Annual Maintenance 2025 26 KIP O and M Annual maintanence of canals 2025 2026 Jungle clearence and removal of floating bodies during water distribution from Edakkadu I distributory between ch 0m to 5100 m and its 8 minor 2 field boothies an
GENERAL Annual Maintenance 2025 26 KIP O and M Annual maintanence of canals 2025 2026 Jungle clearence and removal of floating bodies during water distribution in Sasthamcotta branch Canal between ch 7000m to 18650 m General Civil Work
GENERAL Action plan Annual maintenance of canal 2025 26 jungle clearance silt removal and removal of floating materials in Thrikkunnapuzha North distributory from ch.0 m to 3760 m minor 1 from ch 0 m to 995 m minor 2 from ch 0m to 1470 m Thrikku
GENERAL Action Plan Annual maintenance of canal 2025 26 jungle clearance silt removal and removal of floating materials in Right bank m a i n c a n a l f r o m c h 6 7 7 9 0 m t o 69752m Edappon distributory from ch om to 6920m Edappon minor 1
GENERAL Action plan Annual maintenance of canal 2025 26 jungle clearance silt removal a n d r e m o v a l o f f l o a t i n g m a t e r i a l s i n Karunagappally branch canal from ch 0m to 6580m Pavumba distributory from ch 0 m to 5780 m
GENERAL-KIP (LB)-Reconstruction of breached flume canal in Paravur distributary at Ch. 6000 m near upasana junction in Chathanoor Panchayath General Civil Work