| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.0 LAccepted-AOC TENDER DOCUMENTS DO NOT CONTAIN THE FULL ADDRESS FOR THIS PRIVATE COMPANY | ₹71.0 L Quoted ₹71.1 L | L1 | Accepted-AOC L1 accepted |
| 2 | L2₹75.4 LRejected-AOC | ₹75.4 L | L2 | Rejected-AOC L2 rejected |
| 3 | L3₹82.0 LRejected-AOC | ₹82.0 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | T Vinodkumar L3 | Rajeev v L2 | SHEJEEB TM L1 |
|---|---|---|---|---|---|---|
| 1.00Reconstruction of Breached flume canal | ||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 735 | sqm | 20 ₹14,700 | 18.19 ₹13,369.65 | 17 ₹12,495 |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 11 | each | 600 ₹6,600 | 550.8 ₹6,058.80 | 517 ₹5,687 |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 14 | each | 2,500 ₹35,000 | 2,454.32 ₹34,360.48 | 2,356 ₹32,984 |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 6 | each | 11,400 ₹68,400 | 11,391.49 ₹68,348.94 | 10,707 ₹64,242 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 296.03 | cum | 300 ₹88,809 | 257.63 ₹76,266.21 | 242 ₹71,639.26 |
| 1.01 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 329.8 | cum | 2,550 ₹8.4 L | 2,516.93 ₹8.3 L | 2,365 ₹7.8 L |
| 1.01 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 220.5 | cum | 3,000 ₹6.6 L | 2,967.19 ₹6.5 L | 2,788 ₹6.1 L |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 1,152.2 | sqm | 900 ₹10.4 L | 839.6 ₹9.7 L | 789.2 ₹9.1 L |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 70.17 | cum | 7,950 ₹5.6 L | 7,932.89 ₹5.6 L | 7,456.8 ₹5.2 L |
Tender Value
₹75.4 L
EMD Value
₹50,000
Closing Date
1 Nov 2025, 6:00 pmClosed
Executive Engineer
o/o the Executive engineer KIP LB Div no 5 kollam
GENERAL-KIP (LB)-Reconstruction of breached flume canal in Paravur distributary at Ch. 6000 m near upasana junction in Chathanoor Panchayath General Civil Work
2025_Irrig_814445_1
IRR/PII/TR/970/2025_5_1_1/1
Open Tender
Civil Works - Others
Chathannoor
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
5 Jan 2026
24 Oct 2025
3 Nov 2025
24 Oct 2025
1 Nov 2025
24 Oct 2025
24 Oct 2025 - 1 Nov 2025
Amount
Reconstruction of Breached flume canal
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
26.40:Providing and fixing hard drawn steel wire fabric of size 75 x25 mm mesh or other suitable size wire mesh to be fixed & firmly anchored to the concrete surface by means of "L" shaped mild steel shear key welded with existing reinforcement including the cost of materials, labour, tool & plants as approved by Engineer-in-charge.
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Rajeev v (BID ID -2421970)
T Vinodkumar (BID ID -2421592)
Bidder Name
T Vinodkumar
SHEJEEB TM
Rajeev v
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1362399.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
viewsbd.pdf
Tender Documents • 2.04 MB
BOQ_1362399.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid