Loading…
Loading…
45 results • Recent activity
GENERAL ACTION PLAN 2025 26 MVIP LBMC Annual Maintenance from ch 8000m to 16000m Palakkuzha distributary from ch 0m to 1870m before lift and from ch 0m to 2300m after lift Urgent Removal of silt and cabomba water born plant in the sump well in
GENERAL ACTION PLAN MVIP Engaging labour shutter operation and other connected works for water distribution from Ch 16000m to 25624m of LBMC and Marika distributory for the year 2025 2026 General Civil Work
GENERAL MVIP Actionplan 2025 26 Kakkoor M D Construction of collapsed protection wall near ch 100 m
GENERAL Action Plan 2025 26 MVIP Ramamangalam Branch Canal Engaging Labour for water distribution through Ramamangalam Branch Canal and its Distributories for the year 2025 26 General Civil Work
GENERAL-Action plan-Annual maintenace to koothattukulam distributary from ch.0m to 7975 m and karikode distributary from ch.0 m to 1210 m for the year 2025-26-General Civil Work
GENERAL-MVIP--MVIP-Ramamangalam Branch Canal- Engaging Labour for water distribution through Ramamangalam Branch Canal and its distributories for the year 2025 26-General Civil Work