| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC KOCHUPARABIL MANNATHOOR P O MUVATTUPUZHA | THRISSUR | KERALA | 680667 | ₹1.5 L | L1 | Accepted-AOC FIRST LOWEST |
| 2 | Rejected-Technical | - | - | Rejected-Technical THIRD LOWEST |
| 3 | Rejected-Technical | - | - | Rejected-Technical SECOND LOWEST |
| Sl No | Description | Qty | Unit | RAJESH THAMPY L1 | Mc.Rajan L3 | Saju C S L2 |
|---|---|---|---|---|---|---|
| 1.00canal clearing | ||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,476 | sqm | 15.5 ₹22,878 | 22 ₹32,472 | 18.19 ₹26,848.44 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 6,906 | sqm | 8 ₹55,248 | 11 ₹75,966 | 9.27 ₹64,018.62 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 281.82 | cum | 220 ₹62,000.40 | 300 ₹84,546 | 257.63 ₹72,605.29 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 2 | hour | 400 ₹800 | 500 ₹1,000 | 455.83 ₹911.66 |
| 2.00Felling of trees | ||||||
| 2.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 4 | each | 600 ₹2,400 | 800 ₹3,200 | 675.98 ₹2,703.92 |
| 3.00Insatllation of measuring scales inside canal | ||||||
| 3.00 | OD18454/2025-2026: Supplying and Fixing of standard size gauge scales - in comply with IS 4048-1994, shall be of
sturdy construction with non-corrosive material, white colour with blue background,
width-100mm to 200mm, thickness:1.5 to 2.5 mm, all including cost and conveyance of all materials, labour charges, hire charges, all other incidental charges etc. complete as per the direction of departmental officers at site. | 1 | each | 1,800 ₹1,800 | 1,900 ₹1,900 | 1,857.78 ₹1,857.78 |
Updated dates
Tender Value
₹1.7 L
EMD Value
₹4,224
Closing Date
24 Feb 2026, 4:30 pmClosed
Assistant Executive Engineer
MVIP Addl Subdivision Piravom
GENERAL-Action plan-Annual maintenace to koothattukulam distributary from ch.0m to 7975 m and karikode distributary from ch.0 m to 1210 m for the year 2025-26-General Civil Work
2026_Irrig_835132_1
IRR/PII/TR/410/2025_5_2_1/1
Open Tender
Civil Works - Canal
365 days
PIRAVOM
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
₹4,224
4 Mar 2026
10 Feb 2026
25 Feb 2026
10 Feb 2026
24 Feb 2026
10 Feb 2026
10 Feb 2026 - 24 Feb 2026
canal clearing
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
Felling of trees
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
Insatllation of measuring scales inside canal
OD18454/2025-2026: Supplying and Fixing of standard size gauge scales - in comply with IS 4048-1994, shall be of sturdy construction with non-corrosive material, white colour with blue background, width-100mm to 200mm, thickness:1.5 to 2.5 mm, all including cost and conveyance of all materials, labour charges, hire charges, all other incidental charges etc. complete as per the direction of departmental officers at site.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1405022.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.65 MB
BOQ_1405022.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid