Loading…
Loading…
213 results • Recent activity
construction of Parapets over existing Rwall from Ch 0 000 to 35 000 and Construction of Catch Pits from Ch 0 000 to 27 000 Buffliaz End
Removal of Slips/Slides/ Surcharge/ Clearance of drains/ cloud burst, Clearance of deposited Mulba from Choked Culverts etc. by Way of Deploying Back and Hoe Loader from Km 0 000 to Km 40 500 in Sub Division 1st, 2nd and 3rd on Shopian Side (Stage Co
Construction of Diversion at Avalanche Prone Stretch at Km 30 800 in Sub Division 2nd on Mughal Road Shopian side
Repair/Renovation of Chief Engineers and Superintending Engineers Office (by way of face lifting) at Lal Mandi Srinagar.
Providing and Erection of Thrie Metal Beam Crash Barriers incl Retro Reflective films from Km 0000 to 40550 (Under Re-appropriation) (Out of Savings) on Mughal Road in Sub Division 2nd and 3rd of Shopian Side.
Fixing of Crash Barriers incl Retro- Reflective films at various spots from Ch.0.000 to 43.000 for the maintenance of Mughal Road at Buffliaz end.OUT OF SAVINGS