Loading…
Loading…
213 results • Recent activity
Re-constructionconstruction of R wall, BWall from chainage 0.000 to 43.000 at different location for the maintenance of Mughal Road at Buffliaz end for the year of 2022-23.
Repair, Renovation of Guest House and Divisional Office of Mughal Road Project at Shopian (Balance work out of savings).
Construction of Rigid Pavement from Km 0.000 to 40.550 at various spots in Sub Division 1st, 2nd and 3rd on Mughal Road Shopian Side
Improvement of Damaged Road Surface by way of 50 mm Thick Macadam, 25 mm thick semi-dense and 6mm seal in patches/stretches (Balance damaged length out of Savings) in Sub Division 1st of Mughal Road on Shopian side. (FRESH TENDER)
Reconstruction/Constt of R/Wall, B/Wall at various spots/ Construction of Gabion Walls at various locations including Cost of Gabions and Construction of PCC Drain from Km 0.000 to Km 19.000 (Out of Savings) in Subdivision 1st, 2nd and 3rd on Shopin
construction of pucca drain from Ch 0.000 to 15.000 for the maintenance of Mughal road at Buffliaz end