improvement of By-passes at avalanche prone stretches/improvement of damaged road surface GSB filling re alignment of road for the maintenance of Mughal road Buffliaz end CH. 16.200 to 16.400.
Widening of Blind Curves at Accidental prone areas at various spots on Shopian Side at Km 22.800.
Improvement of Damaged Road Surface by way of 50 mm Thick Macadam, 25 mm thick semi-dense and 6mm seal in patches/stretches (Balance damaged length out of Savings) in Sub Division 1st of Mughal Road on Shopian side.
Construction of Gabion structure at different location from Ch 0.000 to 43.000 (Out of savings) for the maintenance of Mughal Road at Buffliaz end.
Construction of Breast Wall Cum Drain and Drain for new aligned Dubjan Curve at Km 19.500 (out of savings) in Sub Division 2nd of Mughal Road on Shopian Side.
Construction of Catch Pits of culverts at different locations from Chainage 0.000 to 43.000 For the maintenance of Mughal Road at Buffliaz end during the year of 2022-23