Loading…
Loading…
213 results • Recent activity
Clearance of Slip/slides from Chainage for the maintenance of Mughal Road Buffliaz end occurred due to heavy rain Fall on Mughal Road Buffliaz Side (STAGE-II).
Construction of Rigid Pavement from Km 0.000 to 40.550 at various spots in Sub Division 1st, 2nd and 3rd on Mughal Road Shopian Side
Construction of Parapets over the existing Retaining Walls at required spots in Sub Division 1st and 2nd of Shopian Side.
Providing/laying 100 mm/75mm WMM (in patches/ stretches), 75/50mm thick BM (in patches/stretches), 25mm thick Semi-dense including 6mm thick seal coat Km 1.000 to 6.000 in Sub Division 1st of Mughal Road Shopian Side.
Improvement of Damaged Road Surface by way of 50 mm Thick Macadam, 25 mm thick semi dense and 6mm seal in patches stretches from Km 6th to 9th in Sub Division 1st of Mughal Road on Shopian side.
Repair Renovation and Maintenance of JEs Quarter/Buildings Hut/ Guest House at Chandimarh / Surankote Hut, Guest House, Divisional Office/Complex Buffliaz of Mughal Road Division Buffliaz.