Loading…
Loading…
213 results • Recent activity
Construction of Gabion structure at Ch. 14.600 to 14.650 for the maintenance of Mughal road at Buffliaz end
Construction of Rigid Pavement from Km 0.000 to 40.550 at various spots in Sub Division 1st, 2nd and 3rd on Mughal Road Shopian Side
Reconstruction/Construction of R/Wall, B/Wall at various spots/ Construction of Gabion Walls at various locations including Cost of Gabions and Construction of PCC Drain from Km 0.000 to Km 19.000 (Out of Savings) in Subdiv. 1st, 2nd and 3rd on Shopi
Fixing Erection of Thrie Metal Crash Barrier from Ch 0 to 43 at different locations for the maintainance of Mughal Road at Buffliaz End
Providing, Erection of Thrie Metal Beam Crash Barriers incl Retro Reflective films at Km 32.300, 32.000, 33.000, 34.400, 34.600, 34.900, 36.400, 37.700, 38.000, 38.200, 38.900, 40.200 on Mughal Road in Sub Division 2nd and 3rd of Shopian Side.
Rectification of damaged road surface by way of damaged road shoulder and making parking bay at Tourist places on Mughal road Buffliaz End