Loading…
Loading…
180 results • Recent activity
SH- WBM-III, Repairs of potholes, Carpeting, Re-carpeting, Seal coat etc. during the year 2025-26.
Maintenance of road side berm / drainage system from Gomati DM office to Bramhabari / Construction of RCC cover Drain during the year 2025-26
Metalling, carpeting, C/D and mtc. Of existing drain during the year 2025-2026
Construction of Protection wall at Dakshin Bagma panchayat ward No.5 , Shakuntala palli, Bagabassa Nalchar road and allied works during the year 2025-2026
Mtc. of road from Satchand Bazar to Natun Bazar via Dhanu Chowdhury Para (L-2.50 km). SH -Patch metalling, re-carpeting and seal coat. during the year 2025-26. (Portion from 0.700 km to 2.300 km). Gr-II.
SH- Patch metalling, re-carpeting and seal coat. During the year 2025-26. (Portion from 0.00 km to 1.245 km) Gr-I.