Loading…
Loading…
186 results • Recent activity
Periodical Repair of road from NH-08 to Twisama under PWD(R and B), Sabroom Division during the year 2024-25/ SH - WBM, PMC, CD, and Pucca drain etc. (Chainage from 8.087 km to 8.937km) (2nd Call)
Annual Maintenance of residential building under PWD(R and B) Sabroom Division during the year 2025-26. /SH - Pipeline leakage, motor rewinding, OHP mtc, Earthing, water heater etc. (2nd Call)
FDR/ Maintenance of road from Satchand -Bankul Road to Sevadhan Para (L-1.50 Km) during the year 2025-26 / SH - Construction of 1(one) no. RCC Boxcell (5.00m x 5.00m, Tripple cell) at Ch.3.874 km over local cherra and Approach Road etc. (2nd Call)
SH - Repair to pot holes, Patch metaling, Patch Carpeting, Sand seal coat, placing of wire crates and landslides clearance etc.
Mtc. of road starting from Garjantalli -Damdama via office tilla and SDM office road to NH-8 (Damdama) - Harinarayan pur road via Nipu Debnath house (L-0.105 Km.) SH- Paver Block road etc. During the year 2025-26
SH- Grouting, WBM III, Re-carpeting, seal coat, surface drain, palasiding, Gunny bag placing etc. during the year 2025-26. (Portion from Ch.2.50 km to Ch. 3.640 km) (Group- I). (3rd Call)