Loading…
Loading…
70 results • Latest
GENERAL Sabarimala FW 2025 26 Providing BC overlay to Palamukku Nallila road from Ch 0000 to 3850 General Civil Work
GENERAL Budget 2025 26 20 percent Provision Improvements by Providing Patch BM and 40 mm BC Overlay Oyoor Poriyakkodu Junction Road cha 0000 to 2600 General Civil Work
Sabarimala Festival 2025 26 Providing BM BC to Lekshminada Thankassery road From ch 0550 to 1406 2.356 KM and Division cutchery Vaddi road from Ch 0000 to 1500 in Kollam LAC General Civil Work
this estimate is created for providing side drain for 80m with covering slab and grill for collecting water into the drain at by road.
DEPOSIT KWA pipeline restoration work in Koickamukku Kuttemperoor road ch 0000 2600 General Civil Work
GENERAL Sabarimala Festival Works 2025 26 Improvements by providing BM BC to Pannivizha Parakkodu Theppupara road Pannivizha Palamukku ch 0 000 3 300 in Adoor LAC General Civil Work General Civil Work