Loading…
Loading…
Tender Value
₹3.4 Cr
EMD Value
₹1 L
Closing Date
15 Jun 2026, 5:00 pm
Superintending Engineer, PWD Roads South Circle, T
Office of the Superintending Engineer RoadsSouth Circle
GENERAL Sabarimala Festival Works 2025 26 Improvements by providing BM BC to Pannivizha Parakkodu Theppupara road Pannivizha Palamukku ch 0 000 3 300 in Adoor LAC General Civil Work General Civil Work
2026_PWD_837127_3
PWD/RB/TR/8308/2025_5_1_1/1
Open Tender
Civil Works - Roads
210 days
Pathanamthitta
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,759
Yes
₹1 L
Yes
3 Jun 2026
3 Jun 2026
18 Jun 2026
3 Jun 2026
15 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1ROAD WORK | ||||||
| 1.001 | OD28357/2025-2026:Dismantling of flexible pavement and sectioning the dismantled material and re-rolling | - | sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | 3.8.A:Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. Mechanised | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | 4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method | - | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | - | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. | - | sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 1.007 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | - | sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 1.008 | 5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size) | - | cum | - | - | BI01010001010000000000000515BI0100001121 |
| 1.009 | 5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size) | - | cum | - | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.96 MB
BOQ_1443497.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid