Loading
Loading…
Loading…
78 results • Recent activity
Construction of Escape at Ch 6480 in KM 07 Left Bank Canal of Aruna Medium Irrigation Project
Construction of Approach Slab at at CH 4553 to 4932 on Left Bank Canal of Aruna Medium Irrigation Project
Construction of CR Escape at Ch. 9 940 at Km 10 of the Aruna Left Canal, and construction of CR at Ch. 560 m, Ch. 3055 m, Ch. 4410 m and Ch. 13,000 m on the Aruna Left Canal
Construction of damaged Toe wall
Construction work
Providing labour